AMcama Pow 2r Corrpany 600 North 10tn Stre;t Post Offica Box 2641 Birmingham. Alabama 35291 Te:ephone 205 323-5341 k
h hbo?t^c"le';@n, Alabama Power m roamm e.coc ssem March 26, 1980 Docket No. 50-348 Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission
'4 ashing ton, D.C.
20535 Attn:
Mr. Darrell G. Eisenhut
Dear Mr. Eisenhut:
As a result of discussions held with the NRC Lessons Learned Review Team on February 29, 1980, and telephone conversations on March 21, 1980, Alabama Power Company commits to installing a backup system to the normal instrument air supply for the pressuriser power operated relief valves (PORV).
The design will assure that air is available at all times to operate the PORV's.
Installation of the backup system will be completed by the end of the Unit 1 second refueling outage scheduled to begin in October, 1980.
If you have any questions, please contact us.
Yours very truly, Yjgt cf F.T.klayton Jr.
FLCJr/BDM:bhj cc:
Mr. R. A. Thomas Mr. C. F. Trowbridge l
80040 809e S r{o P