ML19309B809

From kanterella
Jump to navigation Jump to search
IE Insp Rept 70-1100/79-11 on 791211-13.No Noncompliance Noted.Major Areas Inspected:Records,Repts & Physical Inventory Procedures.Details Withheld (Ref 10CFR2.790)
ML19309B809
Person / Time
Site: 07001100
Issue date: 01/31/1980
From: Cohen I, Joyner J, Galen Smith
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML19309B806 List:
References
70-1100-79-11, NUDOCS 8004070207
Download: ML19309B809 (1)


Text

_.

U. S. NUCLEAR REGULATORY COMMISSION

()

0FFICE OF INSPECTION AND ENFORCEMENT REGION I Report No.

70-1100/79-11 Docket No.

70-1100 License No.

SNM 10A7 Safeguards Group 3

Licensee:

Combustion Enaineerino. Inenennratad P.O. Box 500 Windsor, Connecticut 06095 Facility Name:

Nuclear Power Systems - Manufacturing Inspection At:

Windsor, Connecticut

~ Inspection Conducted:

December 11-13. 1979 Date of Last Material Control and Accounting Inspection:

November 9. 1979 Type of Inspection:

Unannounced Material Control & Accountino N18 to Inspectors:

4 I)Co{en,(hemist

,' date I!$O j

G. Smith, Auditor date Approved by:

O J. H. Joyner, Chief, Nuclear Material Control Support / date b

Inspection SummaN. ion, Safeguards Branch Areas Inspected:

Records and Reports and Physical Inventory Procedures.

The inspection involved 50 inspector-hours onsite by two NRC inspectors and was begun during the regular hours.

Results: The licensee was found to be in compliance with NRC requirements in the areas examined.

i

' Region I Form 166 (August 1979)

GOO 4070 M[

r

- - ~

' ' * '