U. S. NUCLEAR REGULATORY COMMISSION
()
0FFICE OF INSPECTION AND ENFORCEMENT REGION I Report No.
70-1100/79-11 Docket No.
70-1100 License No.
SNM 10A7 Safeguards Group 3
Licensee:
Combustion Enaineerino. Inenennratad P.O. Box 500 Windsor, Connecticut 06095 Facility Name:
Nuclear Power Systems - Manufacturing Inspection At:
Windsor, Connecticut
~ Inspection Conducted:
December 11-13. 1979 Date of Last Material Control and Accounting Inspection:
November 9. 1979 Type of Inspection:
Unannounced Material Control & Accountino N18 to Inspectors:
4 I)Co{en,(hemist
,' date I!$O j
G. Smith, Auditor date Approved by:
O J. H. Joyner, Chief, Nuclear Material Control Support / date b
Inspection SummaN. ion, Safeguards Branch Areas Inspected:
Records and Reports and Physical Inventory Procedures.
The inspection involved 50 inspector-hours onsite by two NRC inspectors and was begun during the regular hours.
Results: The licensee was found to be in compliance with NRC requirements in the areas examined.