Submits Status Rept of Stress Analysis & Pipe Support Review as of 800229,in Response to IE Bulletin 79-14.Analysis Has Been Completed for 52 Drawings & Pipe Supports Evaluated for 26 Pipe Lines
ML19309B808
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 03/07/1980
From: Fay C
WISCONSIN ELECTRIC POWER CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
IEB-79-14, NUDOCS 8004070206
Download: ML19309B808 (6)


Text

-

e. 3b Wisconsin Electnc m cown <

231 W. MICHIGAN P.O. BOX 2046. MILWAUKIE WI 5321 March 7, 1980 Mr. J. G. Keppler, Regional Director Office of Inspection and Enforcement, Region III U. S. NUCLEAR REGULATORY COMMISSION 799-Roosevelt Road Glen Ellyn, Illinois 60137

Dear Mr. Keppler:

DOCKET NOS. 50-266 AND 50-301 FURTHER RESPONSE TO IE BULLETIN 79-14 POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 IE Bulletin 79-14 requires licensees to verify for safety-related piping systems that the as-built systems conform to the as-designed seismic analysis and acceptance criteria.

The purpose of this submittal is to provide a progress report on our Bulletin compliance program. This report is our fifth submittal and is a supplement to our responses of August 1, September 7, November 2, and December 20, 1979.

As reported in our December 1979 submittal, essentially all of the piping common to both nuclear units and that located inside the Unit 1 containment structure had been inspected and

,. judged operable. Our December submittal also provided a four page table showing the status of the pipe line stress analysis and pipe support analysis that was being pursued as a result of our program.

Attached hereto is our updated analytical schedule that shows the status of our program as of February 29, 1980; the attached schedule is quite similar to that contained in our December submittal. The attached schedule shows that the piping stress analysis has been completed for 52 drawings (61%) and the pipe supports have been evaluated for 26 (31%) of these pipe lines. While this does not appear to be substantial progress with respect to our December submittal, some calculations previously reported as "DONE" have been determined to require further work when reviewed and checked in detail. Thus, in these cases, the attached schedule presents a date and we believe that this schedule can be maintained.

l l

i. . .a 101980

~

800 4 0 70 2 c>g h_ _ _

,.s- l

'Mr. J..G. Keppler March 7, 1980 e

The Spring 1980 Unit 2 refueling outage is presently I scheduled to commence in early April of this year. During this

-outage,.the remainder of the plant piping systems will be inspected. Accordingly, we anticipate.that our next submittal will be forwarded to NRC in May 1980. If.you require any addi-tional information at this time, please contact us.

Very truly yours,

/

s (- 'A C. W. Fay,' Director Nuclear Power Department Attachment

~

Copies to: Office of Inspection and Enforcement Division of Reactor Operations Inspection Mr. A. Schwencer, Chief Operating Reactors Branch 1 r

+

POINT BEACH NUCLEAR PLANT

, STATUS OF STRESS ANALYSIS & PIPE SUPPORT REVIEW FOR NRC IE BULLETIN 79-14

~

(2/29/80 ISSUE) i.

'I .

STATUS OF PIPE SUPPORT STRESS PIPING LOCATION STATUS OF REVIEW OR. APPROXIMAT1 ISO. DWG. INSP. SYSTEM UNIT UNIT STRESS ANALYSIS DATEl ANALYSIS- MODIFICATIO1 NO. PKG. NO. LINE NO. 1 2 OR DATE (ALL BEC) __

BY REQUIRED P-100 23 HB-29 0 DONE 4/8/80 BEC P-101 13a SI-30lR 0 DONE 4/21/80. W P-102 3 SI-151R 0 DONE 4/10/80 W DB-3 DONE DONE BEC-EDAC 0 P-103 8-2&21 0 P-104 14 SI-60lR 0 3/21/80 4/14/80 BEC P-105' 7-2 WD-151R-8 0 DONE 4/10/80 W/BEC 7A WD-151R-8 I EMBED --- - --- 0 P-106* 2-2 EB-8 0 DONE 4/10/80 W/BEC 0

P-107 2-1 EB-1 0 DONE DONE BEC 48 EB-1 I DONE DONE BEC-EDAC 0

'P-108*

P-109- 17 AC-151R-10 0 3/7/80 3/29/80 BEC-JB P-110 7-1 WD-151R-23 0 DONE DONE W 0 EB-9 0 DONE DONE BEC 0 P-lli 2-3 .

EB-9 DONE DONE BEC 0 P-ll2 45 I P-ll3 1-2 3B-19 0 3/28/80 4/20/80 BEC-J.B.

P-ll4 1-1 HB-19 0 3/28/80 '4/20/80 BEC-J.B.

P-ll5 -51 HB-19 I/O 3/28/80 4/21/80 BEC-J.B.

P-116 51 HB-19 I/O 3/28/80 4/21/80 BEC-J.B.

P-ll7 4-la JG-4 0 DONE 4/16/80 W P-ll8 4-lb JG-2 0 DONE 3/27/80 W

-3 0

-4 0

. P-119 10 SI-150lR-1 0 DONE 3/28/80 W

-2 0

-3 0 P-120 44 SI-150lR-2 I DONE 3/20/80 W DONE DONE BEC 0 i P-12f 8-l&21 DB-1 0 3/4/80 3/28/80 BEC-J.B.

P-122 9.- 5 CH-151R-3 0

-8 0 , _

Page 1 of 4 l

,. q O

STATUS OF PIPE SUPPORT LOCATION STATUS OF . REVIEW OR: , APPROXIMATE STRESS INSPa. UNIT UNIT STRESS ANALYSIS DATEl ANALYSIS MODIFICATIONI ISO. DWG. BY-OR DafE (ALL BEC) ~

i .

NO. PKG. NO.- ELINE NO. 1 2 __

_' REQUIRED P-123 9-1 CH-151R-1 0 DONE 4/25/80 BEC

-l CH-151R-4 0 3/10/80 3/20/80 BEC-J.B.

P-124 9-2 P-125 9-3 CH-151R 0 3/7/80 3/20/80 BEC-J.B..

P-126 9-4 CH-151R-23 0 3/22/80 4/15/80 BEC P-127 11 CH-2502R-1 0 DONE 4/30/80 BEC-

-2 0

-3 0 P-128 13-2 SI-30lR-1 I DONE 4/1/80 W P-129 13-2 SI-30lR-1 I DONE 4/18/80 W

47. DONE DONE BEC 2 P-131 SI-150lR-3 I

. P-132 5 AC-60lR-2 0 3/22/80 4/15/80 BEC.

-3, -4, -1 50 SI-151R-X I EMBED --- ---

P-133 5 AC-60lR-6 0 3/22/80 ,4/15/80 BEC P-134 5 AC-60lR-6 0 3/22/80 4/15/80 . BEC P-135 51 HB-19 I/O 4/7/80 4/30/80 BEC-J.B.

DONE DONE W 0

, P-136 24 SI-60lR-2 I SI-250lR-5 RC-250lR-5

. P-137 24 RC-250lR-5,8 I DONE DONE W 4 SI-250lR-1 .

-2, -4, -5 P-138 51 HB-19 I/O 4/8/80 4/30/80 BEC-J.B.

P-139 4-2 HB-19 0 4/8/80 4/30/80. BEC JB-2 2-4 EB-10' DONE 4/30/R0 BEC-EDAC P-140 O 43 EB-10 I DONE 4/30/80 BEC P-141 2-4 EB-10 O DONE 4/4/80 BEC-EDAC 43 EB-10 DONE DONE BEC 1 1 P-142 I W

'P-143* 41 RC-250lR-1 I DONE DONE 4

RC-250lR-2 DONE DONE W 0 41 P-144 I W 0 RC-250lR-Z DONE DONE P-145 41 I

DONE DONE W 0

P-146 41 RC-250lR I 0

P-147 15 CH-60lR-1 I EMBED --- ---

DONE W 5

. P-148 12 AC-60lR-2 I DONE

-6

. P-149 6 AC-152N O 3/13/80 4/5/80 BEC-EDAC ,

j l Page 2 of 4

STATUS OF. _

PIPE SUPPORT -

STRESS LOCATION STATUS OF REVIEW OR APPROXIMATE

. ISO. DWG. INSP. UNIT UNIT STRESS ANALYSIS- DATEl ANALYSIS MODIFICATION:

NO. ' PKG. NO. LINE'NO. 1 2 OR DATE (ALL BEC) BY REQUIRED f P-150 49 AC-152N-4 I DONE DONE BEC-J.B. 3 P-151 49 AC-152N-4 I DONE DONE DEC-J.B. O P-152 49 AC-152N-4 I DONE DONE BEC-J.B. 2 P-153 6 AC-152N O 3/13/80 4/6/80 BEC-EDAC P-154 16 CH-250lR-4 I DONE DONE BEC 0 CII-25 02 R-3 P-155 9A. Cil-151R-2 0 DONE DONE BEC 0

-11 P-156 1 HB-19 0 4/7/80 4/30/80 BEC P-157 151 PA-151R-1 I DONE DONE BEC-J.B. 0 P-201 28A SI-30lR 0 DONE 4/1/80 W P-202 18 SI-151R 0 3/7/80 3/29/80 W/BEC-J.B.

P-204 35 SI-60lR-2 0 3/7/80 3/29/80 W/BEC-J.B.

, P-206 19 EB-8 0 DONE 4/1/80 W P-207** 39 EB-1 0 DONE DONE BEC 0 P-211- 22 EB-9 0 DONE DONE BEC 0

! P-213 1-5 HB-19 0 4/7/80 4/30/80 BEC JB-2 4-2 HB-19 0 4/7/80 4/30/80 BEC JB-1

-2 P-214 1-5 HB-19 0 3/28/80 4 / 21 / 8 0 BEC-J.B.

JB-1

-2 P-215 1-5 HB-19 0/I 3/28/80 4/21/80 BEC-J.B.

P-216 1-5 -

HB-19 0/I 3/28/80 4/21/80 BEC-J.B.

P-219 25 SI-150lR-1 0 DONE 4/15/80 W P-220 25 SI-150lR-2 0 DONE 4/15/80 W P-221 20 DB-1 0 DONE DONE BEC 0 i P-222 20 EB-9 0 DONE DONE BEC 0 DB-1 I P-223 27 CH-151R-1 0 4/6/80 4/29/80 BEC-J.B.

P-224 27 CII-151R-1 0 4/6/80 4/29/80 BEC P-225 27A Clf-151R-2 0 DONE 3/18/80 BEC-J.B.

-11 j Page 3 of 4

e 4 .

STATUS OF PIPE SUPPORT STRESS LOCATION STATUS OF REVIEW OR APPROXIMATE ISO. DWG. INSP. UNIT UNIT STRESS ANALYSIS DATE1 ANALYSIS MODIFICATIONE NO. PKG. NO. LINE NO. _

1 2 OR DATE (ALL BEC) BY REQUIRED

-P-227 26 CH-2502R-2 0 DONE 3/29/80 BEC-J.B.

-3 P-228 26 CH-2503R-2 0 DONE 3/29/80 BEC-J.B.

-3 P-231 28A SI-30lR 0 DONE 3/27/80 BEC-J.B.

P-232 30 AC-60lR-1 0 DONE 4/30/80 W

-2

-3 P-233 30 AC-60lR-4 0 3/4/80 3/27/80 BEC-J.B.

P-234 30 AC-60lR-6 0 3/4/80 3/27/80 BEC-J.B.

. .P-240 2-4 EB-10 0 3/14/80 4/4/80 BEC-EDAC P-241 2-4 EB-10 0 3/14/80 4/4/80 BEC-EDAC P-249 :29 AC-152N 0 3/13/80 4/5/80 BEC-EDAC P-253 29 AC-152N O 3/13/80 4/5/80 BEC-EDAC P-255 27A CH-151R-2 0 DONE 3/18/80

  • BEC-J.B.

-11 DEFINITIONS:

I - Inside Containment W - Westinghouse Electric Corporation 0 - Outside Containment EDAC - Subcontractor to Bechtel BEC Bechtel Power Corporation JB - Subcontractor to Bechtel

  • - Detailed review indicates analysis may need to be revised.
    • - Modifications are required in the seismic category II portion of the pipeline.
1. The completion of the pipe support review means that the number and type of modifications, if required, are known but drawings for construction are not yet avai'lable.

t Page 4 of 4