Text
i MATGIAL TW:S'"TT:D PIRMiTH C0!! Tali:S 2.7C i::T.D.T31 i
p r,q e
(,
4 UNITED STATES (3 8 I4 NUCLEAR REGULATORY COMMISSION
. 'v'
- < E REGION 11 e'f o,,
101 MARIETTA ST., N.W., SUITE 3100 ATLANTA, GEORGIA 30303 MAR 111980 Report No. 70-2478/80-01 Docket No. 70-2478 License No. ISNM 1698 Licensee: TRANSNUCLEAR, INC.
Attn:
J. Mangusi, General Manager / Operations One North Broadway White Plains, New York 10601 Inspection at: Savannah River Plant, Barnwell, South Carolina Inspection conducted: February 26-27, 1980 Type of Inspection: Announced Physical Security Inspector:
A._
dMI4' J"/d ~[d C.D.Perny,SecurityInspectp Date Approved by:
(
S3 * ~
}/ /o/E6 drW. J. Tobin, Acting Chief, Security Section Datd Safeguards Branch Inspection Summary Areas Inspected: The inspection,was conducted to ensure that the licensee complied with specific license conditions and regulatory requirements for the physical protection of irradiated fuel in transit.
The inspection involved 8 inspcctor hours on site by 1 NRC inspector.
The inspection was during an offshift period.
Results: The licensee was found to be in compliance with NRC requirements within the areas examined.
S-TQ_,{0._
h Y Copy __,____of Copies A
' wn This Decer:r'. ! G nnt to be re' reducc6 ;;itM.t crocific nrpre ;al cf II.':II MTRIALTEAt's",tTT:D HEMITH h
bb CONIAlHs 2.70015FOMT10'd 4