ML19309B122
| ML19309B122 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 03/12/1980 |
| From: | Grimes B NRC - EMERGENCY PREPAREDNESS TASK FORCE |
| To: | Ryan R Federal Emergency Management Agency |
| References | |
| NUDOCS 8004030162 | |
| Download: ML19309B122 (4) | |
Text
__________ __
NRC PUBUC 7{o DOCUMENT ROOM 8 [*"%
UNITED STATES g
NUCLEAR REGULATORY COMMISSION o
t
~E WASHINGTON, D. C. 20655
%,.. /
M:rch 12, 1980 Mr. Robert G. Ryan, Co-Chairman NRC/ FEMA Steering Committee for Emergency Preparedness Federal Emergency Management Agency 18th and F Streets, N.W.
. C.
20472
DearJrr TyE:
As you know, the Nuc1 car Regulatory Commission's Special Inquiry Group (SIG) on the Accident at Three Mile Island recently provided the results of its work to the Commission. The extensive findings and recommendations of the report included a number of items related to emergency preparedness planning around nuclear power plants and to the Federal role in responding to nuclear power plant emergencies. A considerable number of these items deal with responsibilities that have been assigned to FEMA by the President's December 7, 1979, directive. Enclosure 1 to this letter is an index of the recommendations which we believe either directly relate to FEMA responsibili-ties, or relate to areas in which FEMA has a coordinating role. 'Ihree com-plete sets of the SIG report and the February 6, 1980 NRC staff analysis of the report are being provided to you under separate cover.
The recommendations identified in Enclosure 1 are provided for FEMA's information and consideration.
If FEMA decides to take action as a result of these recommendations, we would appreciate being informed.
Sincerely, Brian Grimes Co-Chairman NRC/ FEMA Steering Committee for Emergency Preparedness
Enclosures:
1.
Index of Reconnnendations 2.
NRC/TMI Report (3) (Separate cover) 3.
NRC Staff Analysis of Report (3)
(Separate cover) l 8004030 I62
INDEX OF SPECIAL INVESTIGATION GROUP RECOMMENDATIONS APPROPRIATE FOR FEMA CONSIDERATION 1
Volume I Report Page Staff Summary Item f
130 G.I.b 130 G.2.a 131 G.2.b 131 G.2.c l
132 G.2.d 132 G.2.e 132 G.2.f 132 G.2.g
{
j 132, 133 G.2.h i
133 G.2.i i
133 G.2.j 134 G.3.c r
137 G.4.a 137 G.4.b 137 G 4.c 157 J.1.a 157 J.2.a 157 J.2.b f
157 J.2.c -
. Volume II (Draft)
Report Part Staff Summary (page)
(items)
II.B.I.(a) 4 (39)
II.B.S.(b) 8 (143)
II.B.5.(b) 17 (157)
II. B.5. (b) 22 (161)
II.F.
1 (424) 2 III.A.3.
2 1*
(95) 4 5
6 III.A.7.
2 (183)
III.B.3.c.
5 (274-279) 6 10 24 25 30 37 c
39 40 41 III.C.3.
1 (303-305) 2 3
4 5-4
o o
Volume II (Draft) (continued)
Report Part Staff Summary
[
(page)
(items) l III.C.4.
1 (319 and 320) 2 3
4*
5 III.C.5.
1 (335-338) 2 3
4 III.C.6.
1 l
(349-350) 2 3
4 III.C.7.
1 (357-358) 2 3
4 III.C.8.
1 (365-366) 2 III.C.10.
1 (371-378) 2 3
4 5
6 7
8 i
9 III.D.
1 (403-408) 2 3
4 5
6 10
- Refer to report for. sub-items omitted from staff summary.