p NRC P nM 196 U.S. NU! LEAR REIULATOT.Y COM.SSION DOCKET NUMBE 7 t>K. *
- A -8/3 NRC DISTRIBUTION ron PART 50 DOCKET MATERIAL TJ#
FROM:
DATs OF DOCUMENT Mr. Robert Reid SMUD 7-18-77 Sacramento, Calif.
95813
,,7,,,,,,y,,
J.J. Mattimoe 7-22-77 M ETTEn OrvoTOnizRD PROP tNPUT PORM NUMBER OF COPIES RECEIVED dMiGINAL NUNCLASSIPlE O Cc "
l A/6A)eD
"" * "Ltr re NRC ltr of May 18, 1977....
i request for extension until Aug. 31, 1977 MDGED to furn info on reactor vessel materials..
1 DONOT REMOVE PLANT NAME:
Rancho Seco DHL 7-26-77 DISTRIBUTION FOR REACTOR VESSEL SUPPORT INFO POR OPERATING REACTORS PER MR. TRAMMELL 7-12-76 SAFETT FOR ACTION /INFORMATION _
ASSIGNED ADr 7
___PRANCIL cMTRFe I
-VblD PRO.IECT MANAGER!
7k LIC. ASST:
)
l f
,m INTERNAL OlSTRIBUTION
[ REC FI"R >
am rut BOSNAK ROSZTOCZY CHECK C. TRAMMELL SHA0 P. BARAN0WSKY P. NORIAN R. BOSNAK V. NCONAN EXTERNAL DISTRIBUTION CONTROL NUMBER l LPDRt.54#APW
- AF.
h 7=7ccip-
. - - - fw 8.0 0 4 0 20 67Y
~ c n Mi..
p r]
g uuo SACRAMENTO MUNICIPAL UTILITY DISTRICT O 6201 S street, Box 15830, Sacramento, California 95813; (916) 452-3211 July 18,1977 Director of Nuclear Reactor Regulation x
Attention: Mr. Robert W. Reid, Chief r
Operating Reactors, Branch 4
/s/
U. S. Nuclear Regulatory Commission
/%/$.k 3
-/
Washington, D.~C.
20555 N
~ E9ff" ! l 3
~
Docket No. 50-312 i
r/
Rancho Seco Nuclear Generating 4
5 Station, Unit No. 1
Dear Mr. Reid:
In response to your letter of May 18, 1977 regarding the need for information on reactor vessel. materials, we have requested the Babcock
& Wilcox Company, the supplier of the reactor vessel for Rancho Seco Unit No.1, to prepare the information requested in the enclosure to your letter. As you know, most of the requested information has previously been submitted in connection with the review for our participation in the integrated reactor vessel surveillance prog.7m (RVSP) on B&W 177 fuel assembly plants. As a part of the activity associated with the integrated P. VSP the weld material information is presently under certification review to assure all weld wire and flux heats and lots used for the surveillance programs are accurately identified.
Also, B&W will shortly begin work on a study to investigate the uncertainty in the chemical composition of certain of the weld materials as a part of the B&W integrated surveillance program.
Since the present schedules for these activities are not compatible with the 60-day response requested in your letter, we request an extension until August 31, 1977 to supply the requested information. This response will not include the weld metal chemistry information which will be supplied in a later sub-mittal upon completion of the B&W study.
Sincerely yours, L.v. % tt a
' J. 'J. Mattimoe Assistant General Manager end Chief Engineer
-c k)
/
_,- p E
AN ELECTRIC SYSTEV SERVINO MORE THAN 600.000 IN THE HEART CF C A l f f 0 Rj i A
_