ML19309A984

From kanterella
Jump to navigation Jump to search
Part 21 Rept:Insp Completed on Crackshaft Thrust Bearing on Generator A.Plugs Properly Installed & Unit Free of Potential Defect
ML19309A984
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 03/06/1980
From: Moriarty J
COLT INDUSTRIES, INC.
To:
References
REF-PT21-80-191-002 NUDOCS 8004020455
Download: ML19309A984 (1)


Text

-.

o .

ATTACED IS A PART 21 REPORT FROM IE f%IL UNIT - ROOM 359Ehl

.[

PART21IDENTIFICATIONiD. To 'IP oa COMPANY NAFE teat dAL -

DATE OF ETTER  %/fo DOCKET to s~o -us-DATE DISTRIP M D -

3/"/F o ORIGINALREPORT SUPPLBBffARY k DISTRIBUTION:

K REACTOR (R) _

FUELCYCLE&[ SAFEGUARDS (S) f%TERIALS(M)

NRR/ DOR, DIRECTOR AD/FR1SI ' AD/SG-IE I!RR/DR1 DIRECTOR LES/FCMS AD/ROI AD/RDI ( 2 ) REGIONS REGIONS AD/RCI IEFILES NRR/ DOR,DIPECTOR REGIONS PDR NMSS/SG SS-881

-IEFILEST(2)L LPDR PDR CBfiPAL FILES CBffPAL FILES-SS-396 LPDR CBiT IES (CHRON) TEPA CB]AL FILES (CHRON)

IE FI E S (2)

LPDR CBiTPAL FIES 016

@ LOEB/f?A fi4B5715 CENTRAL FIES (CHED LCEB/ IPA fliB5715 CENTRAL FIES - SS-396 l

ACTION: LDEB/t?A FiiB 5715 l l PRELIMINARY EVUALATION OF THE ATTACHED REPORT INDICATES LEAD RESPONSIBILIT(iOR FOLLGV-UP AS SH0hN BELG4:

N N Eb E -.-

CHEP ROI SG FFMSI I

REV, 2/26/80 8 004 020k-83

a .

~~

- Fahnks Morn ChltIndustries Engine olvision 701 Lawton Avenue Beloit. Wisconsin 53511 608/364-4411 bl/ki'fD $00D 3-/O-0

  • March 6,1980 170 - 19 I-- CD () Du Office of Inspection & Enforcement '

U. S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Ill. 60137 Attention: Mr. James G. Keppler, Director, Region III

Subject:

Colt Industries-Fairbanks Morse Engine Division Emergency Diesel Generators South Carolina Electric & Gas Co.-Summer Station January 14,1980 Part 21 Report-Failed Engine Thrust Bearing Supplement No. 2 Second Summer Station Unit ("A" Unit)

Gentlemen:

We have completed our inspection of the crankshaft thrust bearing on the "A" generator set at South Carolina Electric & Gas Co. , Summer Station.

The plugs were properly installed in this unit. The unit is free of the reported potential defect. .

We will be inspecting other shipped units prior to initiai operation and will report the results of those inspections as they are made.

A copy of this report is being forwarded to the utility involved.

Very truly yours, f --

f4 # M

. M. Moriart u

~~

MANAGER UTILI ALES .

JMM:jc cc: South Carolina Electric & Gas Co.

P. O. Box 764 Columbia, South Carolina 29210 n

.s. - 17VI 1gggO Attention: Mr. Dan Nauman

. Manager, Quality Assurance & Security ,

l I

i l

i r

A *=.aa a re cui muev oo aw en

  • "..