ML19309A912

From kanterella
Jump to navigation Jump to search
Forwards LERs 80-018/03L-0 & 80-019/03L-0
Date released: 11/19/2019 Download: ML19309A912


LER 80-019/03L-0:on 800229,during Performance of Control Room Train A(B) Ventilation Operability Test,Recirculation Fan 1B Failed to Start.Caused by Blown Control Power Fuse & Shorted Alarm Relay Coil.Coil & Fuse Replaced
ML19309A917
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 03/21/1980
From: Hairston W
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19309A917 (1)
Forwards LERs 80-018/03L-0 & 80-019/03L-0
ML19309A911
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 03/21/1980
From: Clayton F
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19309A911 (1)