ML19309A863

From kanterella
Jump to navigation Jump to search
Forwards LER 80-013/03L-0
Date released: 11/19/2019 Download: ML19309A863


LER 80-013/03L-0:on 800225,while Performing Surveillance Test,Channel D Containment High Pressure Trip Setpoint Was Less Conservative than Value Given in Tech Specs.Caused by Failed Signal Isolator 1-E/E-5313D
ML19309A866
Person / Time
Site: Calvert Cliffs Constellation icon.png
Issue date: 03/25/1980
From: Heibel R, Rizzo P
BALTIMORE GAS & ELECTRIC CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML19309A866 (2)
Forwards LER 80-013/03L-0
ML19309A862
Person / Time
Site: Calvert Cliffs Constellation icon.png
Issue date: 03/25/1980
From: Russell L
BALTIMORE GAS & ELECTRIC CO.
To: GRIER B H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML19309A862 (1)