ML19309A823
| ML19309A823 | |
| Person / Time | |
|---|---|
| Site: | Surry |
| Issue date: | 03/28/1980 |
| From: | Spencer W VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
| To: | Harold Denton Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML19309A824 | List: |
| References | |
| 048A, 48A, NUDOCS 8004010384 | |
| Download: ML19309A823 (1) | |
Text
,
89 VIRGINIA ELECTRIC AND Pownu COMPANY Rscunown.VassointA 20s61 March 28, 1980 Mr. Harold R. Denton, Director Serial No. 048A Office of Nuclear Reactor Regulation PSESC/CMRJr:bcm U. S. Nuclear Regulatory Commission Washington, DC 20555 Docket No. 50-280 License No. DPR-32 SHOW CAUSE ORDER REANALYSIS REPORT ERRATA INSERT TRANSMITTAL SURRY POWER STATION UNIT I
Dear Mr. Denton:
The Virgi;.ia Electric and Power Company letter of January 15, 1980, Serial 048, included a report that concluded our detailed submittals on the Design Basis Earthquake for Unit 1.
The assembly and categorization of data for this submittal resulted in some minor errors which we seek to rectify. Enclosed are instructions and replacement pages for that submittal.
The subject changes noted in the margins, are minor, generally typographical in nature, and do not impact our previous letters which stated that the Design Basis Earthquake Analysis and installation of "Show Cause" modifications is complete.
We regret the inconvenience.
I f you have any question, please contact us.
Very ruly yours,
. k h
,_e s W.
. Spencer Vice President - Power Station Engineering and Construction Services
\\
Attachment I
g
\\
cc:
Mr. Victor Stello, Director A
g/)0 p g i Office of Inspection E, Enforcement l
[A Mr. James P. O'Reilly, Director l
Office of Inspection and Enforcement b
Region 11 l
l 800.40103f59