AEC DISTRIBUTION FOR PART 50 DOCKET MATERIAL (TEMPORARY FORM)
CONTROL NO:
10764 FILE:
FROM: N DATE OF DOC DATE REC'D LTR TWX RPT OTHER Sacramento, Calif.
95813 J. J. Mattimoe 10-9-74 10-17-74 X
TO:
X "r.
Giambusso 1 signed SENT LOCAL PL?R CLASS UNCLASS PROPINFO INPUT NO CYS REC'D DOCKET NO:
XXXX 1
50-312 DESCRIPTION:
ENCLOSURES:
Ltr furnishing info concerning inservice inspection of pressurized uater reactor steam generator tubes.......
J.
s PLANT NAME: Rancho Seco Unit # 1 FOR ACTION /INFORMATION 10-19-74 AB BUTLER (L)
/SCHWENCER (L) ZIEMANN (L)
REGAN (E)
W/ Copies WS Copies W/ Copies W/ Copies CLAR K (L)
STOLZ (L)
DICKER (E)
LEAR (L)
W/ Copies W/ Copies W/ Copies W/ Copies PARR (L)
VASSALLO (L)
KNIGHTON (E)
W/ Copies W/ Copies W/ Copies W/ Copies KNIEL (L)
PURPLE (L)
YOUNGBLOOD (E) opies W/ Copies W/ Copies W/ Copies INTERNAL DISTRIBUTION G FILEj TECH REVIEW DENTON
_ LIC ASST A/T IND
/ AEL run GRIMES BRAITMAN OGC, ROOM P 506A SCHROEDER GAMMILL DIGGS (L)
SALTZMAN MUNTZING/ STAFF MACCARY KASTNER GEARIN (L)
- 8. HURT CASE KNIGHT BALLARD
/GOU LBOURNE (L)
GIAMBUSSO PAWLICKl SPANGLER KREUTZER (E)
PLANS BOYD SHAO LEE (L)
MCDONALD
/ MOORE (L) (BWR)
STELLO ENVIRO MAIGRET (L)
CHAPMAN DEYOUNG (L) (PWR)
HOUSTON MULLER REED (E)
DU BE w/ input SKOVHOLT (L)
NOVAK DICKER SERVICE (L)
E. COUPE GOLLER (L)
ROSS KNIGHTON SHEPPARD (L)
P. COLLINS IPPOLITO YOUNGBLOOD SLATER (E)
D. THOMPSON (2)
DENISE TEDESCO REGAN SMITH (L)
KLECKER REG OPR LONG PROJECT LDR TE ETS (L)
EISENHUT
/ FILE & REGION (3)
MORRIS BENAROYA HAR LESS WILSON (L)
STEELE VOLlMER 8009.,m
<m EXTERNAL DISTRIBUTION
~ " # CV
/1 - LOCAL PDR Sacramento, CA.
/1 - TIC (ABERNATHY) (1)(2)(10) - N ATIONAL LABS 1 - PDR-SAN /bo@Het
/1 - NSIC (BUCHANAN) 1 - ASLBP(E/W Bldg Rm S29) 1 - BROOKHAVEN NAT LAB 1 - ASLB 1 - W. PENNINGTON, Rm E-201 GT 1 - G. ULRIKSON, ORN L
,1 - Newton Anderson 1 - B&M SWINEBROAD, Rm E-201 GT 1 - AGMED (RUTH GUSSMAN)
/6-ACRS WENT TO LIC4 - CONSULTANTS Rm B-127 GT ASST. E. GOULBOURNE FOR DIST.
NEWMARK/BLUME/AGBABIAN
. 1 - R. D. MUELLER, Rm E-201 f
GT
}.I
)
Ta cy.n
~.
~
R$
D
~
SACRAMENTO MUNICIPAL UTILITY DISTRICT O 6201 S Street, Box 15830. Sacramento, California 95813; (916) 452-3211 October 9,1974 Mr. Angelo Giambusso Deputy Director for Reactor Projects
_ m Directorate of Licensing 4
n
- 3. '/'If [
U. S. Atomic Energy Comission
\\
Washington,. D. C.
20545 ef AEC Docket No. 50-312 k7 M
4,gh.
Rancho Seco Nuclear Generating gj m
Station, Unit No.1
.,h, Compliance with AEC Regulatory
'b Guide No. l.83 Inservice Inspection of Pressurized g
Water Reactor Steam Generator Tubes
Dear Mr. Giambusso:
The operating license for Rancho Seco Unit No. I was issued on August 16,1974, with initial criticality occurring on September 16, 1974.
Based on these events, we did not obtain our baseline inspection prior to initial operation and therefore are covered by Section D.2 relative to the time period before our first baseline inspection.
We are concerned that this may impose an extreme economic burden on our company since this inspection would necessitate an extended outage prior to our first refueling period.
To avoid this undesirable economic impact, we would propose that our initial baseline inspection be deferred until the. first refueling outage unless one of the following conditions exist:
1.
An unscheduled inspection is required per Regulatory Guide 1.83, Position C 6e, which states that inspection should be conducted in the event of:
A.
A primary or secondary leak which exceeds Technical Specifications, B.
A seismic occurrence greater than an operating base earthquake, C.
A loss of coolant accident requiring actuation of i
engineering safeguards, or l
D.
A main steam or feedwater line break'.
'd l
10784 l
AN ELECTRIC SYSTEM S E RVIN G MORE THAN 600,000 IN THE HEART OF C All F O R N I A
~]
)
.v Mr. Angelo Giambusso October 9,1974-2.
We have a scheduled extended outage in excess of four weeks after the plant has been in commercial operation for at least six months.
3.
A generic problem has developed with this particular type of steam generator.
We >lan to use the eddy cuirent inspection technique and will incorporate tie inspection of the steam generator tubes into our total Inservice Inspectico Program.
Your favorable consideration of this request will be appreciated.
Sincerely yours,
.WA j
J. J. Mattimoe Assistant General Manager and Chief Engineer 1