ML19309A576

From kanterella
Jump to navigation Jump to search
Urges Lifting of Licensing Moratorium
ML19309A576
Person / Time
Site: Crane Constellation icon.png
Issue date: 12/10/1979
From: Todd Jackson
External Citizen/Individual/Media (Affiliation Not Assigned)
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML19309A571 List:
References
NUDOCS 8003310449
Download: ML19309A576 (1)


Text

.

'[

h iM December 10, 1979 Nuclear Reactor Regulation Office Nuclear Regulatory Coc: mission 1717 H. Street, N.W.

Washington, D.C.

20555 Attn: Mr. Parold R. Denton, Director

Dear Sir:

I feel that the NRC action of 11/5/79 to stop issuing construction permits and operating licenses for nuclear power plants was particularly ill-timed and ill-advised. There are seven nuclear units awaiting the licenses that would allow them to begin commercial operations. Since a typical reactor displaces about 10 million barrels of oil a year, these nuclear facilities could be helping the U.S. offset the oil we are losing because of the Iranian shut-off. Is the mining, processing, and burning of the coal needed to replace this oil less detrimental to the health of the U.S. population? I urge, therefore, that the issuing of permits and licenses be considered on a plant-by-plant basis and the general moratorium be lifted.

Cord i, ally,

jb-~.

C Thomas P. Jackson 1892 Edgewater Cincinnati, Ohio 45240 i

dC 800331 0

,i i

i I

.