ML19309A529

From kanterella
Jump to navigation Jump to search
Notification of Contract Execution,Mod 5 to Two Phase Flow Phenomena in Nuclear Reactor Technology. Contractor: Rensselaer Polytechnic Inst
ML19309A529
Person / Time
Issue date: 02/12/1980
From: Jacobs A
NRC OFFICE OF ADMINISTRATION (ADM)
To:
Shared Package
ML19309A524 List:
References
CON-FIN-B-5873, CON-NRC-04-76-301, CON-NRC-4-76-301 NUDOCS 8003310403
Download: ML19309A529 (1)


Text

__

co*T"^'3' uri" ype, g,n. 33 f4RC-04-76-301 prVe5 ION Of CONT R ACTS MODIF IC AT10N NUMiiE R U S NUCLE AR REGULATORY CCMMISSION W AsHINGTON. D C 20555

[J NE W fR MODif IC ATIO*.

OTHE R (Sswcoty)

NOTIFICA7 TON OF CONTRACT EXECUTION CONT R ACT B ASED ON:

TO:

Polly Schofield AUTHORIZATION NUMBER iTottel RES-76-301 j

Office of fluclear Regulatory Research DATE

'lll80 10gnasu,on)

Mh CONTR ACT CH ANGES PER THIS ACTIO*d Alonzo Jac bs 24,/80 rRoM:

1

< con,, <, s-,r,,rl IDeel Additional funds (FY '80) i I

j Research Contracts Branch DIVISION OF CONTRACTS, ADM CONT R ACT OR INan-A L acernon)

E XECUTION DATE h'

2!/

Rensselaer Polytechnic Institute Troy,fiY Tyre Or cONTR ACT SRSA PERIOD OF PERFORM ANCE PROJECT TITL E Two Phase flow Phenomena in fluclear Reactor Technology rRiNCirAt NVESTIG ATOR i

R. T. Lahey, Jr.

NRC AUTHORIZED RL rf tESENTATIVE Y. Y. Hsu C&R NUMBER FIN NUMBER 60-19-11-01 85873 NEW NRC FUNDS S 55,QQQJ)0 FUNDING TOTAL FY 8 0 FUNDING S

55,000.00 LOT AL NRC OBLIGATIONS S 945,135.00

^ 2 ' ^ C" E N ' 'S)

,OVE Gf4ME N 1 i I: OPE H T Y ft/A 1

CONT H ACT DOCU*.*f NT t NHC i UI.V ?%

)

10 1(.i f=

V D

8003310 %