ML19309A519

From kanterella
Jump to navigation Jump to search
IE Insp Rept 70-2479/80-01 on 800104 & 07-08.No Noncompliance Noted.Major Areas Inspected:Procedures & Requirements for Irradiated Fuel in Transit.Details Withheld (Ref 10CFR2.790)
ML19309A519
Person / Time
Site: 07002479
Issue date: 01/18/1980
From: Howell J, Moore D, Tobin W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML19309A516 List:
References
FOIA-80-298 70-2479-80-01, 70-2479-80-1, NUDOCS 8003310389
Download: ML19309A519 (1)


Text

r ft?,Tfil?.L T."."'I:'.TirD 13D"iTH C~)lli.'.II S 2.7C.:5.~..J.Ti3:{

em00 9'o, g

+4 UNITED STATES

/D 8' )

~ ?,

NUCLEAR REGULATORY COMMISSION D

r Ir REGION 11

((

0, 4

101 MARIETTA ST N.W., SulTE 3100 ATLANTA, GEORGIA 30303 J AN 211980 Report No. 70-2479/80-01 Docket No. 70-2479 License No. ISNM 1699 Licensee: Transnuclear, Inc.

5205 Leesburg Pike Falls Church, Virginia 22041 Inspection at: Portsmouth, Virginia and Aiken, South Carolina Inspection conducted: January 4, 7-8, 1980 Type of Inspection: Announced Physical Security Inspectors:

t$

/ p f '2 6 D.E.M' date $igned

/-/6 -fo J[C.}fowell Date Signed Approved by:

\\(

/- l,P-20 W.J.Tobin,AbQngSectionChief, l> ate Signed Safeguards Branch Inspection Summary Areas Inspected: The inspection was conducted to assure the licensee is following established procedures and regulatory requirements for physical protection of irra-diated fuel in-transit.

The inspection involved 15 inspector hours on site by 2 NRC inspectors.

Results: The licensee was found to be in compliance with NRC requirements within the areas examined.

S-F2 [O - O b [

Copy of Ccpics Pec3 This D:er f t it et to be re pro duc'# '~' f '~ it 0.9 0 cific art:reval r

  • I":II DTEL% T t.A!:S!?,lTTED ISWlITH C0!;TI.!NS 7.7 3 UiO3!WIU'I goo 33yg

.g