To
-
-
..
.,
UNhTED STATr5
.
a
'*4
ATOMIC ENERGY CCMNISSION
"
-
.
4
?.
osnacionArs or nseus.Avony oranavsonis
l* [
naosom v
.%
j ,%
,.
3
y . - - = _ - - - - - - -
) 7
.
.nsa m r .c-o c--
- e-
,,,,,,,,,,,m
- *
"
r.o. sox tsis
na zary, m m pean
(415) 486-3141
,
-
'
.
H. D. Thornburg, Chief, Field Support & Enforcement Br.
Directorate of Regulatory Operations, HQ
SACRAMENTO ITNICIPAL UTILITY DISTRICT (RANCHO SECO)
DOCKET No. 50-312
The attached report by our field inspectors of a visit to the subject
facility on April 16-18, 30 and May 6, 7 and 9, 1974 is forwarded for
information. No violations of AEC requirements were identified within
the scope of the inspection.
.
Currently, the initial fuel loading date is slipping a day each day
while an investigation is being made into the cause of vibration
problems in one of the primary coolant pumps.
In view of this, we
believe the facility will not be ready for fuel loading until af ter
g
July 1, 1974. Should the problem require removal of the pump, initial
fuel loading will be delayed for at least an additional five week
period.
)s.Qnn
.
G. S. Spencer, Chief
Reactor Construction and
Operations Branch
En:losure:
RO Inspection Report No. 50-312/74-03
cc w/ enclosure:
RO:HQ (5)
RO Files
,
DR Central Files
.
Regulatory Standards (3)
Directorate of Licensing (13)
m
p
3Y
e,
,
i
-
2
,
,
.
hf
- 7
l
ri
d
/m\\
+.
<
i
- s
O
l
Q
'}
l
'
-
a
i
e
.
o
8 0 03 270 [7f
'
_
_
-
._
,
..