ML19308C951

From kanterella
Jump to navigation Jump to search
Requests That Paragraphs Be Deleted from TMI-1 Operating Procedure 1101-1 & TMI-2 Draft Procedure 1101-1,prohibiting Use of Nitrogen in Pressurizer to Keep Pressurizer Spray Valve Open.B&W 760323 Memo Re Plant Limits Encl
ML19308C951
Person / Time
Site: Crane  Constellation icon.png
Issue date: 03/29/1976
From: Flint J, Rogers L
BABCOCK & WILCOX CO.
To: Colitz J, Herbein J, Geoffrey Miller
METROPOLITAN EDISON CO.
References
TASK-TF, TASK-TMR NUDOCS 8002110690
Download: ML19308C951 (4)


Text

_

j i

\\

g.-

.a q

+

C G i -a..' : I, rj 4

y i

5BbCOCk&WilCOX power cener.een creue P.O. Box 1250, Lyn:hturg, Va. 245C5 Telecnene: (804) 354-5111 March 29,1976 9

PSI-I-2kh Mr. J. G. Herbein Manager, Generation Operations, Nuclear Metropolitan Edison Conpany Post Office Box hSO Middletown, PA 17057 Nr. J. J. Colit:

Superintendent, Unit I Metropolitan Edison Co=pany Post Office Sox hSO Middletown, PA 17057 Mr. G. P. Miller Superintendent, Unit II Metropolitan Edison Conpany Post Office Box hSO Middletown, PA 17057

Subject:

Plant Li=its and Precautione

References:

1.

TMI-I Operating Procedure 1101-1, " Plant li=its and Precautions," Section 1.2, Pressurice- ** *s and Precautions==ber 11 2.

TMI-2 Draft Procedre 1101-1, " Plant Li=its and Precautions," Section 1.2, Presseiter Limits and Precaution nurlber 9 Gentlenen:

References (1) and (2) contain a paragraph which states that the pressurizer spray valve =nst not be opened with nitrogen in the pressuricer. This li=it was established at a time when nitrogen was used to pressurice the RCS to a condition where the CRDM's could be operated. Present operating li=its preclude CRII! operation with nitrogen in the p essei:er and provide for adequate venting of gas prior to operation.

Since the prohibition against spray valve opening with nitrogen in the pressricer provides an unnecesscry operational li=itation du-ing plant cocidown, please delete this paragraph from yor respective procedres.

l l

..,.,.m 2110 kO 800 m s.

+:

y-w w

J. G. Eerbein/J. J. Colit:/G. P.

N er 3/29/76 2

If you have any further questions, please do not hesitate to contact ne.

Very truly yours, L. C. Rogers Manager, Site.Serrices By:

J.N. F.E,&

J. E. Flint Resident En61neer LCR/JEF/ bay cc:

G. A. Eunder R.

Toole E. J. Coppola R. A. Govers J. D. Phinney L. R. Pletke bec: d C. Inckard SI? 05, 06/53

/

6 e

--n-

,,,.--n,. -. - -

-g

.,mm--

4.-g.#g e -#

,w.___ w _ w e- ~.e n e,.- :3 m g h,- ~ e ; c.

... W6

?

L.0 $hoGER 3 -]QH l T F.5LT r 7.M /

oss-s c R;u r Su-up So o'ces

$wk &(1 OAIL b tid ~ lv5 nu uctior.)

S, G 53 3 - 2 3 - 76 e

nesty To THE ATTAf@,f,,,fe[ccRVICE

...r.-

c, < q., c i v i ~,.,

,,ND FOrN/Ar;D ll ?' 7 ',!,-om mG. VA.

t

^

SU P P ORT MAN ^'' " " ' ~ ~ ' ~

o A

f-futj,e d'

'l

. m (m o....,_,_,,,,_.,,,~,

x,, _,,

R EM-I-2W (JA.)

M UK.

. M o.*

a er 9

&I,

\\

m:.

j' 7.5LY 03

.2?- 7/o

. -,, n n

~

l d)'p!y;pD)'li,ilwyMj!g)y6" mur s como um fg jlf6

- de 12 j

t

33 p'x. -5 G/3-)

o // o u OP.2't ii 43 fy[,;

1A.

V SI.TE INS.UCTION O.

=

DISTRIBUTION 3;4. 9 6, C 7 E # # IV ONSE - KfGO.M M

,MM RE j HE BABC0CK & WILCOX COMPA!1Y I/IIM:bi #1_f[Ml POWER GEt1 ERAT 10t1' GROUP APPR O'JE'D

~.

I To l Distribution rom T. F. Sco: - Plant Startup Services Section (Ext. 2519)

{g ses e62.:

Cust. All No.

or Ref. NSS-3 through l!.

LP 1101-01 Sud. Plant Limits and Precautions (DP 1101-01)

Date March 23, 1976

... _. _. ~. _

j-m.i....,.................,..............,.

DISTRIBUTION C. A. Creacy L. C. Rogers R. C. Luken J. T. Janis E. L. Logan R. J. Baker V

E-ach con:ract has a paragraph in the subject draf t pr.ocedure which s:ates that the pressuri:er spray valve must not be opened with nitrogen in the pressurizer.

This limit was established at a time when r.itrogen was used to pressurite the KCS to a condition where CRDMs could be operated.

Present operating limits preclude CpSM operation wi:h nitrogen in the'pressuriser and provide for adequate venting of gas prior to operation.

Since the prohibi: ion against spray valve opening with nitrogen in the pressurizer provides an unnecessary operational limitation during plant cooldown, please reco==end to your customer that this paragraph be deleted.

TFS:NF cc:

C. E. Barksdale J. A. Lauer G. T. Fairburn W. H. Spangler REVIEWED FOR ACCURAC1' J. D. Phinney j

l K. R. Ellisen SICNED:-h-.b-.g7)dr.6/'MJ-i 3

(

R. L. Pittman J. W. Merchant

')

J. J. Kelly "7 3- _ f 0' R. A. Covers D.iT E-t V

1 l

.