ML19308C928
| ML19308C928 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 10/24/1978 |
| From: | Grier B NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Thornburg H NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| References | |
| TASK-TF, TASK-TMR NUDOCS 8002110666 | |
| Download: ML19308C928 (2) | |
Text
N
)
.z.
~ s Sent Mag Card to G. Klingler 3/24/78 g4 W
UNITED STATES g
fe, NUCLEAR REGULATORY COMMisslON f
)@[l $
REGION I 3, t'(h j/... [
431 PARK AVENUE l
KING OF PRUSSIA. PENN5YLVANI A 19406 fJAR 2 41978 MEMORANDUM FOR:
H. D. Thornburg, Director, Division of Reactor Operations Inspection, IE:HQ FROM:
Boyce H. Grier, Director, Region I
SUBJECT:
METROPOLITAN EDIS0N COMPANY, THREE MILE ISLAND, UNIT 2, DOCKET NO. 50-320, LICENSE N0. DPR-73 Conditions specified in License No. DPR-73 require items to be completed to the satisfaction of the Commission prior to achieving certain speci-fied operating conditions and dates.
The purpose of this memorandum is to inform you that RI has verified the aceptable completion of the items to enter Mode 2.
ditionally, the waiver requested by Metropolitan Edison Company for n
Class 1, 2, 3 components, which were to be surveilled in accordance with Section XI of the ASME Boiler and Pressure Vessel Code has not been
(
. issued by NRR.
RI recomends that permission to enter Operational Mode K
2 be withheld pending the issuance of the waiver by NRR.
We have enclosed a proposed memorandum to NRR for your signature on this matter.
y /.i)O hbh' Boyce H. Grier t
f Director
Enclosure:
As Stated i
i cc:
J. H. Sniezek, AD/FC 8002110 N
[
L
4 g# '0%g#
UNITED STATES NUCLEAR REGULATORY COMMISSION y rz
_ 7,1
- i e(t S REGION l gt4("/ >. j sairanxavenue ximo or naussia, ecussvevania is4as MEMORANDUM FOR
Roger S. Boyd, Division of Project Management, NRR FROM:
H. D. Thornburg, Director, Division of Reactor Operations Inspection, IE:HQ
SUBJECT:
METROPOLITAN EDISON COMPANY, THREE MILE ISLAND, UNIT 2, DOCKET 50-320, LICENSE N0. DPR-73 Conditions specified in License No. DPR-73 require items to be completed to the satisfaction of the Comission prior to achieving certain speci-fied operating conditions and dates.
The purpose of this memorandum is to infonn you that the !1ffica of Inspection and Enforcement has verified acceptable completion of those items required to enter Operational Mode 2.
Additionally, the Office of Inspection and Enforcement recommends the permission to enter Operational Mode 2 be withheld pending issuance of a 3 waiver for AMSE Boiler and Pressure Vessel Code Section XI Class 1, 2, 3 components.
H. D. Thornburg Director, ROI cc:
B. H. Grier, RI D. B. Vassallo, NRR J. B. Stolz, NRR H. Silver, NRR 1
(
l L.
i