Summary of Regulatory Review Committee 741004 Meeting 14 Re Proposed Reg Guide for Inservice Insp of Prestressed Concrete Containment Structures W/Grouted Tendons
ML19308C866
Person / Time
Site: Crane Constellation icon.png
Issue date: 10/23/1974
From: Case E
US ATOMIC ENERGY COMMISSION (AEC)
To: Muntzing L
US ATOMIC ENERGY COMMISSION (AEC)
References
TASK-TF, TASK-TMR NUDOCS 8002070616
Download: ML19308C866 (1)


Text

4

[

UNITEm STATES

[N

,h ATOMIC ENERGY COMMISSION

[

}

. y:;__

~^~~

L. Manning Muntzing Director of Regulation SUWARY OF REGULATORY REQUIREMEtiTS REVIEW CCPf4ITTEE MEETI!!G N0.14, OCTOBER 4,1974 1.

The Connittee reviewed proposed Regulatory Guide, INSERVICE INSPECTION OF PRESTRESSED CONCRETE CO ITAIriMENT STRUCTURES WITH GROUTED TENDOiS, and recommended approval subject to the following:

\\

The discussion section should indicate that a description of a.

the calibration procedures are to be included in the PSAR.

b.

The effective date of the guide should be June ',1975 rather 1

than April 1, 1975.

2.

The Committee discussed problems related to BWR torus integrity and noted that this issue concerned resolution of an operational problem, rather than a ratchet, and as such concurred with the approach. The Committee observed that while referral to the Connittee of this doubtful " ratchet" was the conservative apprcach, it wished to take the opportunity to emphasize the general requirement that all matters should be screened through the management chain prior to submittal in order to maintain maximum Connittee effectiveness.

I 3.

The third item on the agenda, EVALUATION OF TECHNICAL COMPETENCE OF UTILITY APPLICANTS, was referred back to the staff without J

discussion.

g

.h Edson G. Ca #

Chairman, Regulatory Requirements R.eview Committee cc:

L. Rogers J. Davis

0. Knuth R. Minogue L. Gossick F. Schroeder S. Hanauer J. Peters H. Shapar S. Varga A. Giambusso 8002070 h 5

.