ML19308C863
| ML19308C863 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 02/10/1977 |
| From: | Case E Office of Nuclear Reactor Regulation |
| To: | Gossick L NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO) |
| References | |
| RTR-REGGD-01.097, RTR-REGGD-01.106, RTR-REGGD-1.106, TASK-TF, TASK-TMR NUDOCS 8002070613 | |
| Download: ML19308C863 (2) | |
Text
.-
[ Pro,S v
UNITED STA GS NUCLEAR REGULATOP'. COMMISSION h
- E..k].f._[%a $p j WASHINGTON, D.. 20555 b.
February 10, 1977 MDIORANDUM FOR:
Lee V. Gossick/ Executive Director for Operations FROft:
E. G. Case, Chairman, Regulatory. Requirements Review Committee SUBJECr:
SUF21ARY OF REGULATORY REQUIRE'!E:!TS REVIEU CO?21ITTEE MEETING NO. 58, JANUARY 28, 1977 The Comittee reviewed:
1.
PIOPOSED REVISION 1 TO REGULATORY GUIDC 1.106, "THERf!AL OVERLOAD PIOTECTION FOR ELECTRIC eDIORS ON MOICE-OPERATED VALVES" and recommended aoproval.
The Comittee characterized this guide as Category 1 - No backfit.
N 2.
PROPOSED REGULATORY GUIDE 1.XX, "It1STALLATIOd DESIGN AND INSTALLATION OF LARGE LEAD STORAGE BATTERIES FOR 11UCLEAR POER PLANTS" and recoc.T. ended approval with the following comment:
a.
Although the Comittee characterized this guide QCategory 1 - No backfit, it recommended that the Office of Inspection and Edforcement give added emphasis in its inspection of existing facilities to the hydrogen explosion potential of large lead sealed cell storage batteries.
3.
PROPOSED REVISION 1 TO REGULAIORY GUIDE 1.97, "INSTRUMD1TATION FOR LIGHT-WATER-COOLED dUCLEAR PONER PLANTS TO ASSESS PLANT CONDITIONS DURING AtID FOLIMING AN ACCIDENT" and returned it to the staff for rework and resubmittal in accordance with Comittee comments, including:
a.
Justification of the specific values chosen for the ranges of the instruments listed in paragraph C-3.
b.
Consideration of the environmental Iincluding seismic) qualifications for these instruments listed in paragrapn C-3.
-c.
Consideration of the comments on this guide from the Division of Operating Reactors (Environmental Evaluation Branch).
8002070 (( 3
e Lee V. Gossick The. Committee has characteri::ed this guide as Gategory 3 - Backfit recuired -
for all applications in review for which the Q-2 questions to the applih have not yet been sent; and Category 2 - Further staff consideration of individual cases required inTc6.termine the need for backfitting -
fo reactors.
4.
PFDPOSED REGULNIORY GUIDE 1.XX, " DESIGN RDJJIREMEITIS FOR FUEL OIL SYSTDIS FOR STNIDBY DIESEL GEtlERATORS" and returned it to the staff for rework and resubmittal in accordance with Comittee comments, including:
a.
Consideration of the appropriate nu.oer of fuel o'.1 tanks for a
' facility with one unit and two units; the tank interconnection philosophy and safety and safeguards requirements and the quality assurance requirements for such installations.
The remairiing item on the agenda was aferred by'
- ff request to a later meetir.g.
E Case, Chairdian Pegulatory Requirements Review Connittee 6
V b
,-