ML19308C842
| ML19308C842 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 07/21/1976 |
| From: | Case E Office of Nuclear Reactor Regulation |
| To: | Gossick L NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO) |
| References | |
| RTR-REGGD-01.031, RTR-REGGD-01.038, RTR-REGGD-01.068, RTR-REGGD-1.038, TASK-OS, TASK-RS-036-2, TASK-TF, TASK-TMR NUDOCS 8002070592 | |
| Download: ML19308C842 (2) | |
Text
_ -.. - - _ _ _ _ -
' c [".) 1 UNITED. TATES
- 4 NUCLEAR REGULl,' 33Y COMMKS!OTJ y:)
3 WASHIN370a. 3. c. 205*=
1~
5 4
.JUL.: ' G3 Lee V. Gossick Executive Director for Oper:tions REGULATORi REQUIREMENTS REVIEW COMMITTEE MEET:NG N0. 51, JULY 20, 1r/C The Co.T:nittee reviewed:
1.
Propased Revision 1 to Regulatory Guide 1.38, " QUALITY ASSURANCE REQUIREMENTS FOR PACKAGING, SHIPPING, RECEIVING, STORAGE, AND HANDLING OF ITEMS FOR i!ATER-CCOLED NUCLEAR POWER PLANTS" and re-corrended approval.
The Conaittee characterized this guide as Caggory 1 - No cackfit.
2.
Procosed Regulatory Guide I.XX, " DESIGN LIMITS, LOADING COMBINA-TIONS, AND SUPPLEME.'ITARY CRITERIA FOR CLASS 1 LINEAR TYPE COMPONENT SUPPORTS" an:. recorreended approval subject to the following comment:
a.
The introductor) text of the guide sncuid indicate that the guide termir. ology will be appropriately modified to t.e con-sistent with the changes being made in the ASME Boilar and Pressure Vessel Code,Section III, Subsection NF tenninology.
The Committee characterized this proposed guide at Catagory 1 -
No backfiu.
3.
Proposed Regulatory Guide I.XX (RS 035-2), " QUALITY ASSURANCE RE-QUIREMENTS FOR CONTROL OF PROCUREMENT OF ITEMS AND SERVICES FOR l
NUCLEAR POWER PLANTS" and re::mmended appre, val.
e o t ce characterized this proposed guide as 1-4.
Proposed Revision of Standard Reviev Plan 5.2.3, Tecnaicai Pcsi-tion MTEB 5-1, " CONTROL OF STAINLES3 STEEL WELDING" and while concurring with the proposed revision, recommended that in uance 8002070 ffR 4
2
' c withheid pending a revision co Regulatcry Guide 1.3!
w-t utilizes, essentially unchangcc, the technical content of One propc ed Standard Revi2w Plan as concurreu in by the Comi
.c2.
Such a revision to Regulatory Gu.de 1.31 should ce orocess u as rapidly as possible and need not Se refe:rcJ occk. r Corrmittse revic.-i. The proposed SRP can inca sic. ply :: farance the Regul3-tory Guide.
The C. :.t.ittee recomet. dad that tac sti.te.wnt on N. 3 of tr.e dropned revis ca (last. ords of Section C.2) conctrning w21d; cToloying ccnsumable inserts bc,tarified as to precisa ir.ter c.
Tr.e C4r.iittea cnaracterized this ' ropa;cd re'lision Wad the re-
.:c:randec revision to R2;ulatory luida 1.3!.' hs Catagory 1 - No oackfit.
5.
. ropc:.ed Revisica 1 to Rqvictory Guide 1.68, 'INITU.i. TEST PROGF/.*:S FCR WATER-C003:o REACTOR POWER PL!.iiTS" rid rsferrec
.t
.;ack n the staff for.do.tional internal review and consic:,-
' tion of' Cormittee corrment5, incl ling... : Comittee reccari. w tion raat the propcsed esporting.equ'remer.t be eliminata.
The proposed revision :,hould be resubmittet: tc the Comit% rs soon as possible.
- lQ s r "
l I
EuSon (.I* h Chrirman, iegulatc.~j Rag tre.er:c Revie-i C:mittee cc:
B. Ruscne cc:
- h..iaapar S. Hanauer F. Schroeder H. Kouts S. Varga E. Volgenau T. Rchm D. Kntth M. Grossmar R. M.i.ogue R. Cunninght a J. Davis L. Rouse R. Boyd PM AD's R. He;neman SS AD's V. Stello OR AD's H. Denton SS & EA AD's B. Gri.er
_ _ _ - _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _