ML19308C828

From kanterella
Jump to navigation Jump to search
Summary of Regulatory Review Committee 750516 Meeting 29 Re Division of Technical Review Position on Containment Purging During Normal Reactor Operation
ML19308C828
Person / Time
Site: Crane 
Issue date: 07/08/1975
From: Case E
Office of Nuclear Reactor Regulation
To: Gossick L
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
References
TASK-TF, TASK-TMR NUDOCS 8002070578
Download: ML19308C828 (1)


Text

e e

2.

UNITED STATES NUCLEAR REGULATCaY COMMisslON W A 5 HIN GTO N, C. C. 2 0 5 5 5 JUL 8 075

~ Lee V. Gossick Executive Director for Operations REGULATORY REQUIREttENTS REVIE'l COPEITTEE MEETII:G N0. 29, MAY 16, 1975 The Co mittee reviewed the proposed position of the Division of Technical Review on CONTAINME':T PURGI:!G DURI"G l10?J'AL REACTOR OPERATIO!1 and recomended approval subject to the following.

'cocir.ents :

a.

The position is acceptable as a Branch Technical Position outlining current practice, pending preparation of a Regulatory Guide on this subject.

b.

The proposed implementation section is not recoceended for approval and should be reworked in light of Comittee comments and resubmitted witn the Regulctcry Guide to be prepared.

c.

Additional measures should be included in the guide on the system design ccncerning tne leak-tignt provisions of the valves, the requirements for monitoring continued leak-tight effectiveness, on-line testing, and system raliability requirements.

d..The discussion in paragraph h of the proposed position concerning minimizing (or eliminating) the neeo for on-line purging should be considerably strengthened and emphasized as the regulatory goal.

S

/

l Edson G. Case i

Chairma, Regulatory Reouirements Review Committee cc:

'H.' Kouts G. Arlotto B. Rusche F. Schroeder D. Knuth S. Varga S. Hanauer D. Eisenhut H.'Shapar T. Rehm

.J. Gallo K. Chapman 8002O'r067[r A. Giambusso R. Cunningham i

R. Boyd

.RL ads R. Minogue TR ads J. Davis g

,