hA-

.c - -

8 t UNITED STATES NLN

[s ** "8 coq'o, o

NUCLEAR REGULATORY COMMISSION a!' N Itf GloN IV n

E I ' * ' '

o 611 nY AN Pt AZ A DHIVE,SulTC 1000

[l 7.{

ARLINGTON, TEX AS 76012 Y%.,,,,/

16 NOV EA Docket No. 99900392/79-01 Speedway Machine and Tool Company, Inc.

At.tn :

Mr. L. A. Roth President 1802 North Luett Street Indianapolis, Indiana 46222 Centlemen:

'lhis refers to the QA Program inspection conducted by Mr. Ross L. Brown of this office on October 22-26, 1979, of your facility at Indianapolis, Indiana associated with the manufacture of seismic support platforms and tic rod assemblien and to the discussion of our findings with you and members of your utaf f at the conclunion of the inspection.

This inspection was made to confirm that, in the areas inspected, your QA Program in being effectively impicmented. The inspection effort is not designed to assure that unique quality requirements imposed by a customer are being implemented; nor to assure that a specific product, component or service provided i

by you to your customers, is of acceptable quality. As you know, the NRC requires each of its licensees to assume full responsibility for the quality I

of specific products, components or services procured from others. You should therefore not conclude that the NRC's inspection exempts you from inspections by an NRC licensee or his agents nor from taking effective corrective action in response to their iindings.

l Areas examined during the inspection and our findings are discussed in the enclosed report.

Within these areas, the inspection consisted of an examination of procedures and representative records, interviews with personnel, and observations by the inspector.

Within the scope of this inspection, we found no instance where you failed l

to meet NRC requirements.

I g002010 32.6

~

L_,._ __

=-

Speedway Machine and Tool Company, Inc. In accordance with Section 2.790 of the Commission's " Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations, a copy of this letter together with the enclosed inspection report will be placed in the Commission's Public Document Room.

If this report contains any information that you believe to be proprietary, it is necessary that you make a written application within thirty (30) days to this office to withhold such information from public disclosure.

Any such application must include a full statement of the reasons on the basis of which it is claimed that the information is proprietary, and should be prepared so that proprietary information identified in the application is contained in a separate part of the document.

If we do not hear from you in this regard within the specified period, the report will be placed in the Public Document Room.

Should you have any queations concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

,8 -

l 0.L '

U1isPotapova,jav24)

Chigf Vendor Inspection Branch

Enclosure:

Inspection Report No.

99900392/79-01

-- - ~ ~ - - - - -