!j lN$ -O$Nb jyd *L TENTATIVE DETAILED SCHEDULE LACROSSE BOILING WATER REACTOR SUBCCMMPITEE MEETI!G ROCN 1046,1717 H Sr., NW WASHINGTCN, DC OCTOBER 26, 1979 TIMES ARE APPROXIMATE 8:30 a.m.
EXECUTP/E SESSION (OPEN)
Review schedule of presentations and add or delete topics 8:45 a.m.
MEETING WITH CAIRYIAND POWER COCPERATIVE (DPC) AND THE NRC STAFF (DCR) (CPEN) 1.
Description of current spent fuel storage pool and racks - DPC 2.
Description of proposed changes - DPC 3.
Mechanical / Structural considerations including bases for materials selection, unique design details, corrosion or chemical reactions, etc. - DPC 4.
termal/ Hydraulic considerations including cooling following a loss of shield water, pool boiling, lower plenum flow area and potential for blockage, etc. - DPC 5.
Neutronic/ Criticality considerations including conse-quences of a systematic assembly error in the location of the poison strips, ccrrosion or loss of poison, use of soluble poison, etc. - DPC 6.
Access / Handling considerations including radiation exposure for normal operations and with a loss of shield water, etc. - DPC 7.
Operational considerations including installation and removal of fuel and racks, decontamination and disposal of used racks, shield water quality control, cooling system reliability, pool heatup rate, pool housekeeping and handling of damaged fuel, etc. - DPC 8.
NRC review, evaluation and conclusions - DCR 9.
Schedule of futher actions - DOR 2:00 p.m.
CAUCUS (OPEN) 2:30 p.m.
AIMOURN B002010
!