ML19308C644

From kanterella
Jump to navigation Jump to search
Forwards Response to IE Bulletin 79-14,Seismic Analysis for As-Built Safety-Related Piping Sys. No Deficient Supports Have Been Identified Which Affect Operability of Scoped Sys
ML19308C644
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 01/10/1980
From: Clayton F
ALABAMA POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
IEB-79-14, NUDOCS 8002010042
Download: ML19308C644 (2)


Text

Alibima Power Company COO North 18th Street g'

Post Offeca Box 2641 4

g Birminghtm. Alibams 35291 Telephons 205 323-5341 d

I b

e F. L CLAYTON, JR.

Aliabanla Nwer Senior wce President

. I 6'

"' l,

the sournern ekctrc system January 10, 1980 Mr. James P. O'Ibilly, Director U. S. Nuclear Ibgulatory Ommission Office of Inspection & Enforcement Region II 101 Marietta Street Suite 3100 Atlanta, Georgia 30303

Dear Sir:

Alabama Power Ctmpany subnits the attached quarterly follow-up status report on the pipe support re-analysis program for Farley Nuclear Plant Unit 1 as ommitted in my letter to you dated October 5, 1979 (response to I.E.Bulletin 79-14).

If you have any questi^".0, please advise.

Yours very truly, b L. Claytoy, Jr.@@,k['

FICjr/lIRF/Imb Attachment cc: Mr. R. A. 'Ihamas Mr. G. F. Trowbridge L

Office of I&E Divn. of Ibactor Operations Inspection Washington, D. C.

90-N ma

...{0OROI

.M

f I

e Reanalysis of Farley Unit 1 Pipe Supports Follow-up Status Report (Response to I. E.Bulletin 79-14)

January 4,1980 Total Number of Pipe Supports In Analysis Program 1,520 Number of Support Analyses Conpleted 757 Number of Support Analyses in Progress 525 Number of Supports Identified as Requiring 1

Modification During Second Refueling Outage a

No deficient supports have been identified which affect operability of any scoped systems.

WM

  • M F

7 e

,,