$ Kteg' c

UNITED STATES

[ ~ g%[/[',)

NUCLEAR REGULATORY COMMISSION c,

?,

t 4241/ 5

% ".... /

AUG 2 01979 MEMORANDUM FOR:

Task Group 3 Members FROM:

Frank J. Miraglia, Leader Task Group 3

SUBJECT:

PROPOSED OUTLINE FOR TASK GROUP 3 MEMBERS On August 6,1979, I assigned Task Group 3 Members the responsibility for coordinating the various sections of the SIG Report for which we had a lead or support role.

As we have discussed, the SIG Report will have a number of appendices which will contain the technical discussion and analyses to support the f.indings made and conclusions drawn in the nar-rative report.

While it is not clear whether the final SIG Report will contain " stand-alone" appendices or just the necessary technical analysis and data; it is my view that we should plan to prepare a " stand-alone" appendix which can be pared down as needed later. is a proposed outline for this " stand-alone" appendix.

This outline attempts to reflect the tasks outlined in our initial scope of work and the issues in the final SIG Report which we are to address.

Your coments on the proposed outline are requested by c.o.b. August 23, 1979.

The appendix will contain all the references and documentation required to support the sections of the final SIG Report we provide.

In various sec-tions of the outline I have noted where each of the Report Sections should be discussed. contains a schedule for completing the various final SIG Report Sections.

The appendix should be prepared in parallel with these sections.

The appendix should be completed by October 15, 1979. indicates which Task Group 3 Member has been assigned overall respor.sibility for co-ordinating each appendix section.

. \\. K L

Fran b..i elia, Leader Task Group 3

Enclosures:

As stated cc:

G. Frampton R. DeYoung 8001 ggg g/ 7 p

PROPOSED OUTLXNE FOR TASK GROUP 3 APPENDXX,,,

.~

1.0 Background

Discussion of fission product formation, nature of material released and biological considerations.

(L. Battist)

Report Sections 1.6.1 and 1.6.2*

2.0 Release Pathways and Mechanisms (R. Bellamy) 2.1 Pre-accident background 2.1.1 TMI-2 radwaste system description (1) Gas, o Ventilation system flows-cubic feet per minute o

Installed filters o Gas decay system o Untreated releases o Flow schematic (2) Liquid o Flows-gallons per-day o Tank location o Tank capacities o Untreated releases o Flow schematic (3) Solid o

Installed system 2.1.2 TMI-l (1) Interties with TMI-2 2.1.3 Doerating history (1) Releases (2)

Problems 2.2 Status at time of accident 2.2.1 Operating systems

  • Report Section Numbers refer to Outline of Final Report dated 7/29/79

(1) Status (2) Remaining capacity 2.2.2 Non-operating systems (1) Reason 2.3 Accident Releases 2.3.1 Curies released per isotope per time (1)

Source (2)

Reason o Planned o' Decision criteria o Unplanned (3)

Receptor for release (4)

Meteorology or liquid dilution at time of release 2.3.2 Radiation sources inplant (1)

Impact on plant operation Report Sections 1.1, 1.6.3, 1.8, 2.1.10, 2.1.17, 2.2.2, 2.2.4, 2.3.1, 2.6, 4.4, 4.6.1, and 5.3 2.4 Mitigation of releases from TMI-2 as a result of the accident 2.4.1 Actions taken (1)

Timi,ng (2)

Criteria for decision (3)

Impa t on plant operation o

Immediate o Long-tenn (4)

Impact on releases o

Inmediate o Long-term (5)

Analysis of Action o Efficiency o Usefulness o Hindsight review (if you had to do it again, would you do it) 2.4.2 Actions not taken (1) Reason (2) Possible consequences Report Sections 1.7, 1.9.2, 2.6, 4,1.4, 4.4 2.5 Remaining Inventory of Radwaste - Recovery Stage 2.5.1 Components with radioactivity (1) Remaining curies (2) Form o Gas o. Liquid o Solid (3) Associated non-radioactivity - total volume of waste (4) Plans for treatment o

In operation o Under construction o Approved o Rejected 2.5.2 Future radioactive releases (1) Planned o Decision criteria o Fonn o Receptor (2) Unplanned 3.0 Radiological Monitoring and Results (O. Lynch) 3.1 Pre accident monitoring capability 3.1.1 On-Site (1) Personnel dosimetry o Dosimeters o Bioassay (2) Personnel monitoring I

I

~

(3) Environmental monitoring o Remote area monitoring o TLD o Sampling

- Air

- Plant effluents

- Other (4) Analysis of calibration Report Sections 2.3.8, 2.4, 2.6, and 5.3 3.1. 2 Off-site (1) Personnel dosimetry o Dosimeters o Bioassay (2) Personnel monitoring i

(3) Environmental monitoring o Remote area monitoring o TLD o Sampling Air Plant effluents Soil Vegetation Food stuff Milk Report Sections 2.4, 2.6, and 5.3 i

3.2 Augmented radiological monitoring program 3.2.1 On-site (1) Agencies (2) Augmentation o Service

- Natu.e

- Locations

- Capabilities o Time

~

~

o Coordination

- Criteria for deployment

- Interface

- Requestor 3.2.2 Off-site (1) Agencies (2) Augmentation o Service

- Nature

- Locations

- Capabilities o Time o Coordination

- Criteria for deployment

- Interface

- Requestor Report Sections 1.3:8, 1.4, 1.5, 1.8, 9.3, 9.5, 9.8, 10.2 and 10.3 4.0 Estimate of doses and potential health consecuences of releases of radioactive material (S. Yaniv/L, Battist) 4.1 Dose assessment from external exposure (1) TLD Data

- Met Ed

- NRC

- Other (2) Off-site population dose estimate

- Assessment of ad-hoc comnittee estimates

- Assessment of Presidential Comnittee estimates

- SIG assessments and analyses

- Off-site maximum dose to an invidivual i

(3) Potential health impact of external exposure j

1

- Health effects from low-level radiation l

- Comparison of individual doses with natural background

- Existing cancer rates and risks

- Summary of health effects

- Potential added risk to maximun individual

- Dose rate effects

\\

~ -

0 (4') Other sources of exposures

- Skin doses and health risks from beta and gamma radiation

- Inhalation dose to the lung

- Airborne radiciodine concentrations and doses

- Thyroid dose from ingestion of Iodine-131 in milk Report Sections 1.6.4 thru 1.6.6 5.0, Radiological Protection Program (O. Lynch /S. Yaniv) 5.1 NRC Reouirements Report Sections 5.3 5.2 Licensee Program Report Sections 2.1.16, 2.1.18, 4.2.4, and 5.2 5.3 I&E Insoection of Licensee Radiological Protection Programs Report Section 5.3 6.0 Task Group 3 Recommendations 6.1 Radwaste Systems (R.Bellamy) 6.2 Monitoring (0. Lynch /L. Battist)

- On-site

- Off-site 6.3 Emergency Response to Radiological Incidents (O. Lynch) 6.4 Rcdiological Protection (O. Lynch /S. Yaniv)

Each subsection in Section 6.0 should contain recommendations in these areas:

- Design

- Instrumentation

- Procedures

TASK GROUP 3 - rep 0RT OUTLINE RESP 0NSIBILTTY AND SCHEDULE T.G. -3 Responsible T.G. -3 Member Date For Report Section*

T.G. -3 Role Member Support First Draft 1.1 Support Bellamy Oct 1, 79 1.3.8 Support Lynch Aug 31, 79 1.4 Support Lynch Aug 31, 79 1.5 Support Lynch Aug 31, 79

1. 6.1 Lead Battist Sep 7, 79 1.6.2 Lead Battist Sep 7, 79 1.6.3 Lead Bellamy Oct 15, 79 1.6.4 thru Lead Yaniv/Battist Oct 15, 79 1.6.6 1.7 Support Bellamy/ Lynch Murray Oct 15, 79 1.8 Support Bellamy/ Lynch Battist Oct 1, 79 1.9.2 Support Bellamy Oct 1, 79 2.1.10 Support Bellamy Oct 15, 79 2.1.16 Support Lynch Bellamy Oct 1, 79 2.1.17 Support Bellamy Oct 1, 79 2.1.18 Support Lynch Bellamy Oct 1, 79 1

l 2.2.2 Support Bellamy Sep 7, 79 2.2.4 Support Bellamy/ Lynch Yaniv Oct 1, 79 2.3.1 Support Bellamy Oct 1, 79 2.3.8 Support Lynch /Yaniv Oct 1, 79 2.4 Lead Lynch Battist/Yaniv Oct 15, 79 2.6 Support All Oct 15, 79 4.2.4 Support Lynch Oct 5, 79 4.4 Support Bellamy Oct 1, 79 4.6.1 Support Bellamy Lynch /Yaniv Oct 15, 79 5.2 Lead Lynch /Yaniv Battist Oct 15, 79 5.3 Support All Oct 15, 79 9.3, 9.5, 9.8 Support Lynch Battist Aug 31, 79 (9.f 9.:

Oct 1, 79 (9.: l 10.2, 10.3 Support Lynch /Battist Oct 1, 79 (1C. l Aug 31, 79 (iC

  • Report Section refers to July 30, 1979 draft outline.

'