77.y.,-
UNITED STATES
[-
NUCLEAR REGULATORY COMMISSION:
)M5f-5e E
WAsHIN3 TON, D. C. 20555 k $(:
l ++i
%.~.v j/
January 18, 1977 f
s MEMOPR OUM FOR: Thomas A. Rehn, BenHubermanI'Q FROM:
iW rp..
SUBJECT:
DRAFT PAPER ON PETITION FOR RULEMAKING BY THE ATIRTIIC COUNTY CITIZENS COUNCIL FOR ENVIRONMENT MEb ki=
- m Although I egree with the recom= ended action (page tour of the draft),. I have some basic proble=s with the paper itself and the proposed Notice of Denial of Petition.
I reco:: mend the draft paper be revised. The revision should:
- avoid the i=plicatien that present practice contrasts sharply with the prototype concept by pointing out that, in fact, successive nuclear power plants have usually been preceded by near-prototypes with deconstration recuired for new safety-related features;
- discuss the safety ce:-its of this current evolutionary approach;
- admit t. hat exact prctotype testing may result in added assurance of safety, but concentrate on the cost-benefit argument, i.e.,
that the possible increase in safety for an exact prototype is over-balanced by the incre= ental costs in time, resources, and flexibility for f=p rovement ;
- emphasize that petitioners are addressing only licenses issued under
~
Appendix M of 10 CFR Part 50;
- point out that nacufacturing licenses will be conditioned, i.e., NRC 4+-
is involved in regulating the manufacturing process itself; and
- avoid a purely defensive posture.
The Notice of D e'al should:
- delete all substantive coc=ents on OPS;
- 11=it discussion to %-"ufacturing licenses; and i:::
h O
O JL CONTACT:
OQh Ji= Beckerley (OPI) 634-1643 Enclosure "E"
~
s00117%d N m.
=r e m
m-
=
- -w
g' E:.
.=
thomas A. Teh= -
' note that EC will conduct surveillance of each manufacturing licensee's operations.
I suggest that, at your earliest convenience, we nret with appropriate staff to discuss the above points in greater detai..