ML19308B837

From kanterella
Jump to navigation Jump to search
Forwards Documents Requested During 790906 Meeting & General Public Utils Svc Corp 790921 inter-ofc Memo Re Document request.PA-NJ-MD Interconnection Supplemental Agreement & Composite Agreement Encl
ML19308B837
Person / Time
Site: Crane 
Issue date: 09/24/1979
From: Liberman J
BERLACK, ISRAELS & LIBERMAN
To: Vandenberg L
NRC - NRC THREE MILE ISLAND TASK FORCE
Shared Package
ML19308B838 List:
References
TASK-TF, TASK-TMR NUDOCS 8001170420
Download: ML19308B837 (5)


Text

,

l B ER L ACK, lS R A ELS 86 LI BE R M AN 26 8 ROADWAY J^ " E * *g *e',",",'E N NEW YORK 10 o 0 4 HAR" "ER'ACK J2&SC R. ME E R CARLOS L.tSRAELS 2ANE WLEIN 248*6900 CABLEt S E R I L18 0940*3000 1RA H.JOLLES LEONARD CPSTCtM M ENNETH R. ASHER wA$HINGTON OFFtCE JOHN E. BENNETT DOUG L AS E.DAviDSON 8200 SEVENTEENTH STREET, N.W.

RICHARD J. LUBASCH w ASHINGTON, 0. C. 2OO36 MARC e LASn7 (ao,3 57...no September 24, 1979 1

Mr. Larry Vandenberg U. S. Nuclear Regulatory Commission Washington, D. C. 20555 4

Re:

NRC/TMI Special Inquiry Group

Dear Mr. Vandenberg:

At your meeting on September 6th with Mr. Sims in my office, you requested that he supply you with certain documents.

In response to that request, he has furnished me, to supply to you, the material which you requested and which' is listed in his rnemorandum to me dated September 21, 1Q79, a copy of which is enclosed, together with the material therein referred to.

Sin erely yours, jn d X, <-

James B. Liberman 3

JBL:RD ENCS.

cc:

Messrs.

E. N.

Blake, Jr. (incl." enclosures)

R. H.

Sims 6

a soo12,ro u p

Intsar-Office Msmrrandum k k Service Date-September 21, 1979 REQUEST FOR INFORMATION -

Sut> ject NRC/TMI SPECIAL INQUIRY GROUP Location llartz - Parsippany T

J. B. Liberman On September 6 when we met with Larry Vandenberg of the NRC/TMI Special Inquiry Group, he requested several pieces of information to be sent to Enclosed are three sets of the data requested for your use in re-him.

sponding to his inquiry.

Each set contains the following:

A copy of Jack flerbein's letter to Jack Gassert declaring 1.

TMI Unit #2 commercial, transmittal of the same letter by

~

Slater of ME to Gassert, and Gassert's letter to Kleinbach notifying PJM of the capacity change effective 2300 hours0.0266 days <br />0.639 hours <br />0.0038 weeks <br />8.7515e-4 months <br />, December 30, 1978. TMI #2 was made commercial 800 FM and 906 FM summer and winter rating, respectively.

A copy of the Supplemental Agreement to the PJM Interconnection 2.

dated April 1,1974, including the new schedules

Contract, effective June 1, 1974.

It should be noted that Schedule 1.01 describes the transition period including the planning periods This in effect makes beginning June 1, 1974 and June 1, 1975.

the commitments for capacity allocation purposes effective June 1, 1976 for that planning year.

Although not A Composite of the PJM Interconnection Contract.

3.

the of ficial contract, it reflects all the changes to the original agreement made by supplemental agreements and all of the schedules revised through June 1, 1979.

j dated June 1, 1974, 4.

Excerpts from the Load and Capacity Forecast, showing total PJM and GPU data. Table IA is the summer load and Table ID shows the breakdown of the GPU load capacity forecast.

into the three operating company components.

and capacity forecast Table IIA is the same as Table IA, but for the winter period.

Table IID is the same as Table ID, but for the winter period.

Following that are the historical and projected forced outage rates for the CPU units, existing and future.

Following that are the schedules which calculate the allocation of the PJM forecast 1974-75, 1975-76 and 1976-77.

requirements for the planning periods R.11. SIMS pdd Attachments GPU Servico Corpcnation is a subsidiary of General Public Utilities Corporation

blind cc: !!ccurs. R.H.Zimc/

J.S.Bartman A **

G.P.I.:undrane '

J.A.Poole R.C. Arnold GPU Service Corpoi B.H. Cherry hjl

[,[

S Post Office Box 1018 R.W.Conrad V g* }] g a C

A-

+

Read:ng. Pennsylvann H.M.Dieckamp 215 376-6611 I.R.Finfrock 136 482 J.G.Herbein January 2, 1979 E.F. Hunt J.R. Jones N.C.Mers E.Hevton Jr.

H.J. Slater S.C. Thomas Mr. W. S. Kleinbach PJM Interconnection Office 955 Jefferson Avenue Valley Forge Corporate Center Norristown, Pennsylvania

Dear Wilmer:

f GPU' Capacity Change Effective 2300 hours0.0266 days <br />0.639 hours <br />0.0038 weeks <br />8.7515e-4 months <br /> on December 30, 1978 Three Mile Island #2 was made comimercial for 880 and 906 MW sum-mer and winter rating, respectively. This increases the total GPU installed capacity from 6845 to 7725 MW summer rating and f rom 7375 to 8281 winter rating.

Very truly yours, I

{

, w!

f

c..

/s/g.odc l J.'D. Gassert Diiector-System Operations JDG:AEG cc: PJM Interconnection Operating Committec f

i j

GPU Scrwce Corporation m d subsidary of General Pub!.c Utatics Corporation g

O MET!!OPOLITAN EDISON C O M P A N Y sumu..y o, ce,,c,a iwe um,uc, co,m,.uo,,

'o So!@ct Till?l:1: !!II.1: I S I.A!:1) 1:t'IT #2 Location Reading C0!E!!:RCIAL OPERATION To J. D. CASSERT j

Threc !!ila Island Unit #2 in declared connercial ef fective 2300 hours0.0266 days <br />0.639 hours <br />0.0038 weeks <br />8.7515e-4 months <br />, Decenber 30, 1978, with Installed 1:et Summer and k' inter Capacities of 880 In1 and 906 In1 in accordance uith the attached letter this date from J. G. llerbein, Vice l' resident-Generation.

c d.

J.

Sl ter Ih t.

6444 itJ S :ilta

)

Attachment cc:

J. G. llerhein (w/o attachment)

D. R. Jarmoska/II. L. Robidoux J. 11. Jones N. C.11erz 49

'h < b If1TLil:0ITICI: f."I'f.10ll Ar.!)tJr.1 l

[.h,v.ve.

'f/

/

,*METl!OPOLITAN EDISON COMPANY suos,ua,y or cene,oliwne umain co,,,,ouon COMMERCIAL OPERATION Subjes.t TIIREE MILL ISLAND UNIT NO. 2 Location Reading I

To MR. J.

D.

GASSERT

!h695 Three Mile Island Nuclear Generating Station Unit No. 2 is declared commercial effective 2300 hours0.0266 days <br />0.639 hours <br />0.0038 weeks <br />8.7515e-4 months <br /> 30 December 1978.

The rating of Unit No. 2 for application to PJM accounting is 880 MW not summer rating, 906 MW not wintor rating.

l

~

of J.

G.

IIERBEIN nmh l

cc:

See Attached Distribution

.l i

5 i

4 i

~

i 1

4 4

l i

l t

i l

2 i

IfJTEll-OF FICC.'.1Fi.10H Afjllti.'.1 s-r y

.~

g