Forwards Transcript of Presidents Commission on TMI Accident Interview W/B&W Engineers & Internal B&W Memos Expressing Concern Re Potential for Operator Action to Prematurely Terminate HPI Following Loca.W/O Encls
ML19308B815
Person / Time
Site: Crane Constellation icon.png
Issue date: 07/19/1979
From: Muller R
Advisory Committee on Reactor Safeguards
To:
Advisory Committee on Reactor Safeguards
References
TASK-TF, TASK-TMR NUDOCS 8001170350
Download: ML19308B815 (1)


Text

N

[,

~

UNITED STATES 77'g NUCLEAR REGULATORY COMMISSION ee

$ k 7 J[I I

ADVISORY COMMITTEE ON RE ACTOR SAFEGUARDS

'o[ig)cIS f

WASHINGTON. D. C 20555

(

%.,.+

July 19, 1979 q

vet.ct n e m a n1, s r-D' w "G G&M.

FJ OV 1 197) 3 ACRS KEMENY COMMISSION INTERVIEWS OF B&W ENGINEERS On July 18, the President's Conmission on the TMI Accident interviewed several B&W Engineers. A transcript of this hearing has been. requested.

Jhis morning (July 19th)f Bob ~Leyse' of 'EPRI' was,ki.nd enough lto;providei us withfa' copy..'of the attachsd~ phckage~which he ha'd picked'up at that reeting.

Included herein are internal B&W memos (From Kelly da'ted Nov.1,1977 and Dunn - to Jim Taylor - dated Feb. 9,1978) which express serious concern about the potential for operator action to terminate prematurely the high pressure injection following the initial stage of a LOCA.

Also included are memos on incidents of loss of pressurizer level inii-cation prior to the TMI accident.

fW Ragnwald liuller Senior Staff Engineer Attachments:

As stated cc: ACRS Tech. Staff (w/ attach.)

C. Michelson W. C. Lipinski I. Catton 8001170

.