Responds to Re Groundwater Monitoring Program at Site & Chemical Cleaning of Steam Generators.Monitoring Program Will Be Initiated 800115.Chemical Cleaning of Steam Generators Under Review by NRC
ML19308B677
Person / Time
Site: Crane  Constellation icon.png
Issue date: 01/04/1980
From: Harold Denton
Office of Nuclear Reactor Regulation
To: Frey L
AFFILIATION NOT ASSIGNED
Shared Package
ML19308B678 List:
References
NUDOCS 8001160641
Download: ML19308B677 (3)


Text

.

b d.4 J

Ui4il 4 yn l

l Mrs. Leo A. Drey.

515. West Point Avenue University City MO 63130

Dear Mrs. Drey:

1 Your letter of November 28,1979, to Comissioner Kennedy was given to me j

for response.

A series of 8 monitoring wells will be constructed around the TMI-2 Containment Building to determine if radioactive water is leaking from the building. The licensee plans to drill the wells by January 10. 1980, and will initiate a ground water monitoring program January 15,1980. Test i

results should be available shortly thereafter. A description of the chemical cleaning of steam nerators and the chemical cleaning building is contained in the document, pSystem Description For The Once Thru Steam Generator Chemical Cleaning System" (attached). Discussions between Metropolitan Edison ami Babcock and Wilcox Company in the early 1970's at a l

time in which there was limited experience with once through steam generators, indicated that scaling of the tubes may occur, which could cause heat transfer problems. As a result of these discussions, the chemical cleaning operations and building were provided by Met-Ed. However, in the ensuing years, exper-l 1ence gained at TMI-1 indicated that steam generator perfonnance was acceptable and the heat transfer problems had not matera11 red, and it became needed to perform their original purpose. ystem and building would not be apparent to Metropolitan Edison that the s There is no extensive experience with chemical cleaning of steam generators at operating plants. Two plants did small scale experimental work to study the feasibility of chemical cleaning and one plant did some chemical cleaning prior to start up. The question of chemical cleaning.of steam ^ generators at operating plants is currently under review by the NRC.

At the time that the EPICOR-II system was originally put into operation on 1979, construction debris in the line held up processing. After October 22,ly 1% days of system venting, this blockage was cleaned and the l

approximate problem has not recurred. The EPICOR system is functioning at this time and approximately 20% of the Auxiliary Building Water has been processed. The j

i EPICOR system design does not contain tritium removal means, since the i

i l

i QJ g 3oY D.

i S Ob i

8.e 0

0 Mrs. Leo A. Drey technology for tritium remohal is economically unfeasible for large scale operation, however, the tritium levels could be reduced to an acceptable discharge level by dilution of the discharge water.

I trust the aboYe answers are msponsthe to your concents.

-1 steed 4 h,R.Dtut@ J Harold R.' Denton, Director Office of Nuclear Reactor Regulation Attachnent:

System Description for the Once Thru Steam Generator Chemical Cleaning System DISTRIBUTION:

Docket No. 50-320 NRC PDR w/ enclosure Local PDR w/ enclosure NRR r/f SEP/TMI r/f TMI Site r/f E. Case H R Denton

'(

H Berkow/W Russell R.Mattson D Eisenhut D Vassallo D Muller R Vollmer J Collins S Miner J Mullin F P Cardile Commissioner Kennedy Attcrney/ ELD G. Ertter (E00-#7962)

M Groff P Kreutzer, LA D Dilanni R Reid TERA w/ enclosure NOTE SEE PREVIOUS YELLOW FOR ADDITIONAL CONCURRENCES

D:DIR/TMI Sup.DIR/TMI Supp3rt -DIR/NRR-3-

sunuwc)*f.00r.d j.l.e s.i...*JICollins.

  • RHVol.lfoer...

...HRDenton.

onc>..12/19/7.9.

.12/19R9.

..12/.21/19...

... 12/.../7.9.

m

. *v s cove

.wn.

.e.

k'.ETROPOLITANEDISON COMPAN'Y: su m,,

e. c..nci r...ss oo...c 6.mn TMI-II-R-6091-h!J.ct Metropol! tan Edison Cc;.pany location TMI/U-2. Site Ops Three Mile Tsland Units'l&2-Trailer 102
0s
e Dec er.b er 17, 1979 Design Criteria for an OTSG To.

Chemical Cleaning System e

W. Acker This :nemorandum serves to of ficially cenvey one (1) completa copy of subject design criteria to you as requested.

Should there be any questions relative to the docueent please contact the undersigned for resolution.

hj,(('] /

.)

f/ 'W5 W '

~

ves L. D. Garman enc.

J. G. ' lierbein (w/o ene,)

cc:

R. W.~Keaten n-R. M. Rogers

"~

D. M. Shovlin u

D.' G.'Slear a

g P

y, 3

i E

It!TER-OFF CE.1Ef.10RAf20UM -

=

^

G.

c.

~