December 20, 1979 i
I HEMO T0:
John T. Collins, Deputy Director, TMI Support i
i FROM:
Bruce A. Boger, TMI Support
SUBJECT:
STANDBY PRESSURE CONTR01. SYSTEM AUDITS Audits on the Standby Pressure Control System (SPCSJ on THI-2 were started on Tuesday, December 18. To date, four (4) of the six (6) operating shifts have been audited. The final two shifts will be examined during the evening shift of December 20.
The basic audit outline covers SPCS design and SPCS operation unoer nor:aal and abnor:nal conditions. Licensed personnel (SRO and R0) and non-licensed operator trainees are being_inteeviewed.
The results of the audits have been quite satisfactory so far. In addition, to a very good response level, all personnel have been receptive to the examination. A final evaluation of the audits will follow.
,/ VfG Ah' fG Bruce A. Boger' THI Support Distribution SEP r/f PSB r/f TMI r/f NRR r/f- ~~..