ML19308B650

From kanterella
Jump to navigation Jump to search
Notifies That Audits on Standby Pressure Control Sys Were Started 791218.Audited Four of Six Operating Shifts.Basic Audit Outline Covers Standby Pressure Control Sys Desing & Operation Under Normal & Abnormal Conditions
ML19308B650
Person / Time
Site: Crane 
Issue date: 12/20/1979
From: Boger B
NRC - TMI-2 OPERATIONS/SUPPORT TASK FORCE
To: Jay Collins
NRC - TMI-2 OPERATIONS/SUPPORT TASK FORCE
References
NUDOCS 8001160523
Download: ML19308B650 (1)


Text

.

December 20, 1979 i

I HEMO T0:

John T. Collins, Deputy Director, TMI Support i

i FROM:

Bruce A. Boger, TMI Support

SUBJECT:

STANDBY PRESSURE CONTR01. SYSTEM AUDITS Audits on the Standby Pressure Control System (SPCSJ on THI-2 were started on Tuesday, December 18. To date, four (4) of the six (6) operating shifts have been audited. The final two shifts will be examined during the evening shift of December 20.

The basic audit outline covers SPCS design and SPCS operation unoer nor:aal and abnor:nal conditions. Licensed personnel (SRO and R0) and non-licensed operator trainees are being_inteeviewed.

The results of the audits have been quite satisfactory so far. In addition, to a very good response level, all personnel have been receptive to the examination. A final evaluation of the audits will follow.

,/ VfG Ah' fG Bruce A. Boger' THI Support Distribution SEP r/f PSB r/f TMI r/f NRR r/f- ~~..

_1sinl5 s' l

LOCAL POR

^ IEGilRM D3CKET E.E COPY JTCOLLINS RHVOLLMER ORIGINATOR ins 8001 16n f 33

'19e

. - _..... _