ML19308A535
| ML19308A535 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 08/05/1975 |
| From: | Geoffrey Miller METROPOLITAN EDISON CO. |
| To: | |
| References | |
| NUDOCS 7910260533 | |
| Download: ML19308A535 (1) | |
Text
e e
- h$$bS
, N'i ~./ip- - / y
~
c HTP.CPOL4 TAN EDISON COMPANY sacswanyorcenenar.pueu:vrn.ories conronarson Ff9CE DOX 480 MIDDLETOWN, PENNSYLVANIA 17057 TELEPHONE 717-944-4041 0**0 August 5,1975 aa m
l'r. J.P. C'Peuly, Director 5
A Recicn 1
_k Directorate of Regulatory Operations aE_s
_a 631 Park Avenue King of Prussia, Pennsylvania 19406 Gperating 1;1 cense EF&SO Docket 50-289 Subject-Envirtmountal incident tio. El 75-06 Ibar Mr. 0* Reil 2y:
Ihis telegram is to confirm the telecen between Lee Spessard (Region I-NRC)g and G.P. Niller (Unit #2 Superintendent) at 37C0 hours, 5 August 1975.
Violation of the Envimnmental Technical Specification 2 2.2 (Page 19) h that the Plant River Water Discharee Disso4ved Solids exceeded the itmit of 700 pom maximum na 4 August 1975, during release of preaperational cleaning and flushing settling basin water.
Anclysis of the Dissolved Solids in the Plant River hter Discharge en 4 August 1975 was 821 ppm.
Th2 cpplicable irrecedures will be reviewed and changed as required to present future vialations of Technical.Specificatiec'2.2.2.
w r.r trois 3 = rs,
/
G.P. MD1er Enit #2 Supertabendent
- PPJdb 5er J.J. Calitz Unit 11 Superintendent File
- GPM writer's fGe l
l 4910260 N
, ~ - - - - - - - - - - - -
~ ' ' -
~ - ' ' '
" " ' " ' " ' " " ~ ~ * ~ ' ' * ^ ~ ~ ' ' ~ ^ ~ *