Environ Incident 75-06:on 750804,plant River Water Discharge Dissolved Solids Exceeded 700 Parts Per Million Limit During Release of Preoperational Cleaning & Flushing Settling Basin Water.Procedures Under Review
ML19308A535
Person / Time
Site: Crane 
Issue date: 08/05/1975
From: Geoffrey Miller
METROPOLITAN EDISON CO.
To:
References
NUDOCS 7910260533
Download: ML19308A535 (1)


Text

e e

- h$$bS

, N'i ~./ip- - / y

~

c HTP.CPOL4 TAN EDISON COMPANY sacswanyorcenenar.pueu:vrn.ories conronarson Ff9CE DOX 480 MIDDLETOWN, PENNSYLVANIA 17057 TELEPHONE 717-944-4041 0**0 August 5,1975 aa m

l'r. J.P. C'Peuly, Director 5

A Recicn 1

_k Directorate of Regulatory Operations aE_s

_a 631 Park Avenue King of Prussia, Pennsylvania 19406 Gperating 1;1 cense EF&SO Docket 50-289 Subject-Envirtmountal incident tio. El 75-06 Ibar Mr. 0* Reil 2y:

Ihis telegram is to confirm the telecen between Lee Spessard (Region I-NRC)g and G.P. Niller (Unit #2 Superintendent) at 37C0 hours, 5 August 1975.

Violation of the Envimnmental Technical Specification 2 2.2 (Page 19) h that the Plant River Water Discharee Disso4ved Solids exceeded the itmit of 700 pom maximum na 4 August 1975, during release of preaperational cleaning and flushing settling basin water.

Anclysis of the Dissolved Solids in the Plant River hter Discharge en 4 August 1975 was 821 ppm.

Th2 cpplicable irrecedures will be reviewed and changed as required to present future vialations of Technical.Specificatiec'2.2.2.

w r.r trois 3 = rs,

/

G.P. MD1er Enit #2 Supertabendent

PPJdb 5er J.J. Calitz Unit 11 Superintendent File
GPM writer's fGe l

l 4910260 N

, ~ - - - - - - - - - - - -

~ ' ' -

~ - ' ' '

" " ' " ' " ' " " ~ ~ * ~ ' ' * ^ ~ ~ ' ' ~ ^ ~ *