Abnormal Occurrence 74-08:nuclear Overpower Trip for Channel B of Reactor Protection Sys Found Set at Value Greater than 5%.Caused by Incorrect Gain Setting on Channel B Linear Amplifiers.Setting Corrected & All Channels Tested
ML19308A491
Person / Time
Site: Crane Constellation icon.png
Issue date: 06/07/1974
From: Herbein J
METROPOLITAN EDISON CO.
To:
References
NUDOCS 7910250680
Download: ML19308A491 (1)


Text

.

fYdhN;

,utmoPoum) ED150 CClaPM4Y wwarmorcunsu01c urwascov 3STCFFICE SCX 460 M50DLETOWf4, PEP 4t4SYLVAfilA 17057 TELEPHONE 717-944 4Cm June 7,1974 Pr. J.P. O'9nilly, Birector Ofrectorate of Regulatorf Operations Region I 63? Park Avenue

~

Klag of Pruss k, Pa l F 06 Operating Licczss DPR-50 Docket 50-289 Sctfoct: Abnorrai Occurrence !!o. AD 74-3 h

Dear Hr. O'Reilly:

h This telegran is to confim the telecon between L. Spessard (Regfon I-DP.0),

an6 5.G. Hubein (Till Superintendent) at 1030 HRS. June 7, l9N.

Violation of Technical Spectficattan 3.7.h?.h in that the nuclear overpower trip for channel B of the US was detemined to be set at a value greater than 55 The out of specification safety system setting, ddtemind to 6e 20%, resuitd frca an incorrect pain setting on the linear arpIfffets en channet B.

Channels A, C and D were not affected by this setting.

The three unaffected channels were checked for the correct s~;oiifier t.nd Mstable sett}ngs. The cain setting for channel B y;ts returned to the correct setting and the over pr.9 trip for channe) 8 was tested to verlfy that the trip setpoint was less than 5%.

'Jery truly

urs, s

.G. derbein Station Superktendent M Nucicar Stction

...Jcnf &

\\

.+

4/p 69'o f

7910250 l