ML19308A485
| ML19308A485 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 06/14/1974 |
| From: | Herbein J METROPOLITAN EDISON CO. |
| To: | |
| References | |
| NUDOCS 7910250643 | |
| Download: ML19308A485 (1) | |
Text
~
i 4.:::.y - - -
5fT{\\DlQ'CbTEN ~.?J&ON 10,*5ANY Ls%tAGt GFGENEGL r%,.*Cr.:.'.~.'U=%NMrl:V C
ST CFFICE BOX 460 MtODLETOWM.PENNSY1_VAM1A 170S7 TELEPHofE717.rA4.40$1j 2' "
June 161974,,
l j,
3
,.).
- /
y E'
Mr. J.P. O'Pailly, Of rector-
/
., /
Directorate of F.egulatory y,
.f Regfon f 631 Park Avenue Mrs of Prussia, Ps, 19G5 PW D
(gerating Licente DPRi
{". g Docket 50-289 l-g rg q
]7 g h ({of 1 Subfect: Abnormi Occurrence D. A0 74-TO a.
Dear Nr,
O'Reilly:
This telegra is to confim the telecon between Lee Spressard (Rcgion I-AEC),
eniJ.G, Harbein. (Tiff-Superintsdsat) at 1433 HRS.13 Jur,e 19M.
The folleving report is suttritted in accordance with. paragraph 6.7.2'a (pege 6-11)..f the Technicci Specifications.
Cm la Juse the IC thke-up Pq fatied'as a result of being operated with a closej sucticn valve..
At the tic:e of failure the TC mke-ep Ptep wss being pieced in service to stable shut 6m of the 18 mke-up Ptry.
The IB W.ke-up Pu:p was supplyirs reactor coolant syst:n cake-tG water and RC p.cp seal tedection water when the IC Pake-up.Ptra failed.
The TC Rake-up Pu-o tras irradistely shuthra when the rmcal rotor start current was not indicated felicwing control ~ suitch closure.
A thorough investigation is preser,tly beirg conductrA to detemine all ciretnstances surroundirrg the recent Rika-up Pm:p failures.
Very truly p rs,
/f
.c 8 M & > b,., ~s T
f J.G. Hartein Station Superintendent-
. ThT fruclear Statica i
69'3 7
~.
~
JGHhhn 7910259
'A
...