ML19308A449
| ML19308A449 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 10/02/1979 |
| From: | Harold Denton Office of Nuclear Reactor Regulation |
| To: | Gilinsky V, Hendrie J, Kennedy R NRC COMMISSION (OCM) |
| Shared Package | |
| ML19308A451 | List: |
| References | |
| NUDOCS 7910190211 | |
| Download: ML19308A449 (1) | |
Text
.
[3 I
DISTRIBUTION:
Docket. Reading File REGULATORY DEET File COPYEMS DSE Reading File ED0 Reading File HRDenton P0A OCT 2 1979
.EGCase Docket tios. 50-289 SLevine
/gy/
l and 50-320 WRussell FSchroeder DVassallo DEisenhut DRMuller MEM0RAtiDUM FOR: Chairman Hendrie WEKreger Consnissioner Gilinsky LShao Comissioner Kennedy LGHulman Commissioner Bradford GBagchi Comissioner Ahectne MGroff-NRR #3220 AFerguson THRU:
Lee V. Gossick, Executive Director CPaul
.for Operations-HBerkow LVGossick FROM:
Harold R. Denton, Director WSBivins Office.of Nuclear Reactor Regulation Ng 6404557 ti
SUBJECT:
FOLLOW-UP DISCUSSION OF RISK AT THREE MILE ISLATID l
i j
On July 26, 1979, we responifed to a letter from Mr. J. k. Wallis, President-~
l Elect, Section of Hydrology, American Geophysical Union with regard to the treatment of flood risks at Three Mile Island. We provided you with copies of that response. On August 21, 1979, we received a follow-up letter from Mr. Wallis. A copy of the response to Mr. Wallis is enclosed. This response is provided so that you may be kept abreast of the exchange of correspondence.
m
) Driginal sig,xd by
, ~
E. G. Cm 41arold R. Denton, Director Office of tiuclear Reactor Regulation
Enclosure:
Ltr. to J. R. Wallis 791 0
/ f N}h NP cc: w/ enclosure OGC OPE O
- 7. b 4 } 5 ' Y SECY l
(
- Sc. Grev [
I Contact;W.S.Bi$ ins,he 28b a(ow t
,. Q [
'M
.. 3f...MB DSE:SA fr
..DSE:HMB W
,....... 1....'.l..li..
DSE
.L..V..G..
ED WSBivins:km LGHulman WEKreger M.....DRMuller HR n
i c..k -
..................a..
,. 09z.2.w9,..,,,,,
,,.0,9 /,,2,7,?,9,,
.. 09/,,,,..R9 ',,L,,09C,$Z9,,,. 09 /,,'$6,9.,,,,@[,y(79
-c - m <,.m -.u.
., 4 -
M DISTRIBUTION:
Docket. Reading File NRR Reading File HMB Reading File DSE Reading File Docket N
. 50-289 HRDenton an r0-320 EGCase x
Stevine HBerkow WRussell FSchroeder t'EMORAfiDUM FOR:
Co 1ssioner Hendrie DVassallo
[
Co. ssioner Gilinsky DEisenhut Commi ioner Kennedy DRMuller Commiss oner Bradford WEKreger Commissi er Adhearne LShao LGHulman THRU:
Lee V. Goss k, Executive Director GBagchi MGroff-#3220 for Operati s AFerguson Harold R. Denton, Director CPaul Office of Nuclear eactor Regulation FROM:
Daniel R. Muller, Act Director i
Division of Site Safet and i
Environmental Analysis
SUBJECT:
FOLLOW-UP DISCUSSION OF RIS AT THREE MILE. ISLIND 5
On July 26, 1979, we responded to a letter from -. J. R. Wallis, President-i Elect Section of dydrology, American Geophysica-1 nion with regard to the treatment of flood rish at Three Mile Island. We ovided you with copies of that response. On August 21, 1979, we eceived a ollow-up letter from Mr. Wallis..A xerox copy of the response o Mr. Walli is attached. This response is provided so that you may be kept abreast of he exchange of correspondence.
Daniel R. fiuller, Acting Dire tor Division of Site Safety and Environmental Analy.is Office of Nuclear Reactor Regulat on 2219 549 Wiuf69MT w.. <
..gSe:HMB..... mHMB...........D.Se..:S.p.i..DSe...
.. SB.i.y.in.sm.....w:........ man...
........e.K r e.9 e.r..
DRMuiler..
w w
1
. 0.91.1.9119......
.. 99LK..l. 09.
..09LL.\\(09.... 0.9L...D9...
~,.
= m.= m me u.cx ou.
1
-