ML19305E622
| ML19305E622 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 05/01/1980 |
| From: | Mclendon G LOUISIANA POWER & LIGHT CO. |
| To: | Seyfrit K NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| Shared Package | |
| ML19305E623 | List: |
| References | |
| LPL-13857, NUDOCS 8005200133 | |
| Download: ML19305E622 (1) | |
Text
_ _ _ - _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
PDR 80 052 0o gf3 LPDR TIC V NSIC CENTRAL FILES LOUISIANA P O W E R & Li G H T! p,42 caAncNee sraeer
. o. sox 6CC8
- NEW CRLEANS. LOUISIANA 70174. (504) 366-2345 UTtuTTES SYSTEM g g gg,my May 1, 1980 Sen/or wcs Ausc/ent LPL 13857 Q-3-A35.07.14 Mr. K. V. Seyfrit, Director, Region IV U. S. Nuclear Regulatory Commission Office of Inspection & Enforcement 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76012
Subject:
Waterford SES Unit No. 3, Docket No. 50-382 Final Report of Significant Construction Deticiency No.14 " Unsatisfactory Impact Tests on Pipe Penetration Assemblies 3 & 4"
Reference:
LP&L Letter 12361 to NRC dated November 8,1979 (Interim Report)
Dear Mr. Seyfrit:
In accordance with the requirements of 10CFR50.55(e), we are hereby providing two copies of the Final Report of Significant Constmetion Deficiency No.14,
" Unsatisfactory Impact Tests on Pipe Penetration Assemblies 3 and 4. "
Yours very truly, C7~
G DMcL/LLB/mc Enclosures Director, Office of Inspection & Enforcement cc:
U. S. Nuclear Regulatory Commission Washington, D.C.
20555 (with 15 copies of report)
Director, Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D. C.
20555 (with I copy of report)
!