ML19305E510

From kanterella
Jump to navigation Jump to search
Forwards Rept on Reactor Operations for 1979
ML19305E510
Person / Time
Site: University of Michigan
Issue date: 03/25/1980
From: Kerr W
MICHIGAN, UNIV. OF, ANN ARBOR, MI
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML19305E511 List:
References
NUDOCS 8005200006
Download: ML19305E510 (1)


Text

,

O oO6 THE UNIVERSITY OF MICHIGAN

. 0 5 2 @ '.4 i

MICHIGAN MEMORI AL-PHOENIX PROJECT R

N8Ch3 68t3) 744 8888 M.

M CAMPUS ANN A.S... MIC.IS AN 48105 March 25, 1980 U. S. Nucletar Regulatory Commission Region III Attn James G. Keppler Regional Director 799 Poosevelt Road Glen Ellyn, Illinois 60137 Gentlemen:

The enclosed REP. ORT ON REACTOR OPERATIONS for the period January 1, 1979 to December 31, 1979 is submitted to comply with Section 6.6 of the Ford Nuclear Reactor Technical Specifications.

Sincerely, SW William Kerr Director Michigan Memorial-Phoenix Project WK/z Enclosure xc: USNRC, Washington Safety Review Conurdt'.ee (FNR)

Health Physicist (PML)

-