ML19305E439
| ML19305E439 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 03/28/1980 |
| From: | Aswell D LOUISIANA POWER & LIGHT CO. |
| To: | Seyfrit K NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| Shared Package | |
| ML19305E440 | List: |
| References | |
| LPL-13398, NUDOCS 8005120461 | |
| Download: ML19305E439 (1) | |
Text
.
8085120 75 /
7IC 1
LOUISIANA P O W E R & L 1 G H T! P o Box 6008. NEW ORLEANS. LoutSIANA 70174 342 octAnoNoe s1neer
. (504) 366-2345 EIEuSN50S$
March 28,1980 0 L ASWELL vee pres oent-power production LPL 13398 Q-3-A35.07.11 Mr. K. V. Seyfrit, Director, Region IV U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76012
SUBJECT:
Waterford SES Unit 3 Docket No. 50-382 Final Report of Significant Deficiency No.11 Switchgear Breaker Position Switch Operator Defect
REFERENCE:
LP&L Lestter LPL 11136 to NRC dated May 10, 1979
Dear Mr. Seyfrit:
In accordance with the requirements of 10 CFR 50.55(e), we are hereby providing two copies of the Final Report of Significant Deficiency No.11, "Switchgear Breaker Position Switch Operator Defect".
All corrective action work for this significant deficiency is now complete and reinspection has been accomplished. If we can be of further assistance in this matter, please advise.
Yours very truly, D. L. Aswell DLA:TFG:ned Attachment ec:
- 1) Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 (with 15 copies of report)