Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML20217E3021999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Pilgrim Nuclear Station.With ML20216E6881999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Pilgrim Nuclear Power Station.With ML20210R3401999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Pilgrim Nuclear Power Station.With ML20209E6191999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Pilgrim Nuclear Power Station.With ML20195G8231999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Pnps.With ML20206J6611999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Pilgrim Nuclear Power Station.With ML20205L0221999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Pilgrim Nuclear Power Station.With ML20207H5451999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Pilgrim Nuclear Power Station.With ML20206Q2741998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Pilgrim Nuclear Power Station.With ML20197J3591998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Pilgrim Nuclear Power Station.With ML20195C9951998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Pilgrim Nuclear Power Station.With ML20154K0721998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Pilgrim Nuclear Power Station.With ML20151W8231998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Pilgrim Nuclear Power Station.With ML20237A9941998-07-31031 July 1998 Monthly Operating Rept for Pilgrim Nuclear Power Station ML20236P0151998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Pilgrim Nuclear Power Station ML20249A3741998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Pilgrim Nuclear Power Station.W/Undated Ltr ML20247H2081998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Pilgrim Nuclear Power Station ML20216G3911998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Pilgrim Nuclear Power Station ML20248L2241998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Pilgrim Nuclear Station ML20202G5251998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Pilgrim Nuclear Power Station ML20198L7701997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Pilgrim Nuclear Power Station ML20203D6101997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Pilgrim Nuclear Power Station BECO-LTR-97-111, Monthly Operating Rept for Oct 1997 for Pilgrim Nuclear Power Station1997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Pilgrim Nuclear Power Station ML20217H5621997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Pilgrim Nuclear Power Station ML20216J4131997-08-31031 August 1997 Monthly Operating Rept for Aug 1997 for Pilgrim Nuclear Power Station ML20210J3321997-07-31031 July 1997 Monthly Operating Rept for Jul 1997 for Pilgrim Nuclear Power Station ML20148K4161997-05-31031 May 1997 Monthly Operating Rept for Pilgrim Nuclear Power Station ML20141B9631997-04-30030 April 1997 Monthly Operating Rept for Apr 1997 for Pilgrim Nuclear Power Station ML20137T5631997-03-31031 March 1997 Monthly Operating Rept for Mar 1997 for Pilgrim Nuclear Power Station ML20136G7791997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for Pilgrim Nuclear Power Station ML20138K5811997-01-31031 January 1997 Monthly Operating Rept for Jan 1997 for Pilgrim Nuclear Power Station ML20133G5831996-12-31031 December 1996 Monthly Operating Rept for Dec 1996 for Pilgrim Nuclear Power Station BECO-96-106, Monthly Operating Rept for Nov 1996 for Pilgrim Nuclear Power Station1996-11-30030 November 1996 Monthly Operating Rept for Nov 1996 for Pilgrim Nuclear Power Station BECO-LTR-96-097, Monthly Operating Rept for Oct 1996 for Pilgrim Nuclear Power Station1996-10-31031 October 1996 Monthly Operating Rept for Oct 1996 for Pilgrim Nuclear Power Station ML20128N2611996-09-30030 September 1996 Monthly Operating Rept for Sept 1996 for Pilgrim Nuclear Power Station BECO-LTR-96-083, Monthly Operating Rept for Pilgrim Nuclear Power Station for Aug 1996 Ltr1996-08-31031 August 1996 Monthly Operating Rept for Pilgrim Nuclear Power Station for Aug 1996 Ltr ML20116L0841996-07-31031 July 1996 Monthly Operating Rept for Jul 1996 for Pilgrim Nuclear Power Station BECO-LTR-96-066, Monthly Operating Rept for June 1996 for Pilgrim Nuclear Power Station1996-06-30030 June 1996 Monthly Operating Rept for June 1996 for Pilgrim Nuclear Power Station BECO-LTR-96-056, Monthly Operating Rept for May 1996 for Pilgrim Nuclear Power Station1996-05-31031 May 1996 Monthly Operating Rept for May 1996 for Pilgrim Nuclear Power Station ML20117E0961996-04-30030 April 1996 Monthly Operating Rept for Apr 1996 for Pilgrim Nuclear Power Station BECO-LTR-96-034, Monthly Operating Rept for Mar 1996 for Pilgrim Nuclear Power Station1996-03-31031 March 1996 Monthly Operating Rept for Mar 1996 for Pilgrim Nuclear Power Station BECO-LTR-96-023, Monthly Operating Rept for Feb 1996 for Pilgrim Nuclear Power Station1996-02-29029 February 1996 Monthly Operating Rept for Feb 1996 for Pilgrim Nuclear Power Station BECO-LTR-96-008, Monthly Operating Rept for Jan 1996 for Pilgrim Nuclear Power Station1996-01-31031 January 1996 Monthly Operating Rept for Jan 1996 for Pilgrim Nuclear Power Station BECO-LTR-96-004, Monthly Operating Rept for Dec 1995 for Pilgrim Nuclear Power Station1995-12-31031 December 1995 Monthly Operating Rept for Dec 1995 for Pilgrim Nuclear Power Station ML20095E7351995-11-30030 November 1995 Monthly Operating Rept for Nov 1995 for Pilgrim Nuclear Power Station Unit 1 BECO-LTR-95-116, Monthly Operating Rept for Oct 1995 for Pilgrim Nuclear Power Station1995-10-31031 October 1995 Monthly Operating Rept for Oct 1995 for Pilgrim Nuclear Power Station ML20093F5221995-09-30030 September 1995 Monthly Operating Rept for Sept 1995 for Pilgrim Nuclear Power Station BECO-LTR-95-097, Monthly Operating Rept for Aug 1995 for Pilgrim Nuclear Power Station1995-08-31031 August 1995 Monthly Operating Rept for Aug 1995 for Pilgrim Nuclear Power Station BECO-LTR-95-081, Monthly Operating Rept for July 1995 for Pilgrim Nuclear Power Station1995-07-31031 July 1995 Monthly Operating Rept for July 1995 for Pilgrim Nuclear Power Station BECO-LTR-95-071, Monthly Operating Rept for June 1995 for Pilgrim Nuclear Power Plant1995-06-30030 June 1995 Monthly Operating Rept for June 1995 for Pilgrim Nuclear Power Plant 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217E3021999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Pilgrim Nuclear Station.With ML20212C2921999-09-16016 September 1999 SER Accepting Licensee Request for Relief from ASME Code Section XI Requirements as Endorsed by 10CFR50.55a for Containment Insp for Pilgrim Nuclear Power Station ML20216F3511999-09-0808 September 1999 ISI Summary Rept for Refuel Outage 12 at Pnps ML20216E6881999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Pilgrim Nuclear Power Station.With ML20210R3401999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Pilgrim Nuclear Power Station.With ML20209C4731999-07-0707 July 1999 Addendum to SE on Proposed Transfer of Operating License & Matls License from Boston Edison Co to Entergy Nuclear Generation Co ML20209H8251999-07-0101 July 1999 Provides Commission with Evaluation of & Recommendations for Improvement in Processes Used in Staff Review & Approval of Applications for Transfer of Operating Licenses of TMI-1 & Pilgrim Station ML20209E6191999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Pilgrim Nuclear Power Station.With ML20196H2451999-06-29029 June 1999 SER Denying Licensee Proposed Alternative in Relief Request PRR-13,rev 2.Staff Determined That Proposed Alternative Provides Insufficient Info to Determine Adequacy of Scope of Implementation ML20209A8901999-06-28028 June 1999 SER Accepting Licensee Proposed Alternative to Use Code Case N-573 for Remainder of 10-year Interval Pursuant to 10CFR50.55a(a)(3)(i) ML20209B9861999-06-23023 June 1999 Rev 13A to Pilgrim Nuclear Power Station COLR for Cycle 13 ML20217N9061999-06-21021 June 1999 Rept of Changes,Tests & Experiments for Period of 970422-990621 ML20195K3431999-06-15015 June 1999 Safety Evaluation Granting Licensee Request to Use Guidance of GL 90-05 to Repair Flaws in ASME Class 3 Salt Svc Water System Piping for Plant ML20195G8231999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Pnps.With ML20207E7471999-05-27027 May 1999 Safety Evaluation Granting Request Re Reduction of IGSCC Insp of Category D Welds Due to Implementation of HWC to License DPR-35 ML20206M1971999-05-11011 May 1999 SER Accepting Request for Approval to Repair Flaws in ASME Code Class 3 Salt Svc Water Piping at Plant ML20206J6611999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Pilgrim Nuclear Power Station.With ML20205L0221999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Pilgrim Nuclear Power Station.With ML20207J5471999-03-0909 March 1999 Training Simulator,1999 4-Yr Certification Rept ML20207F9401999-03-0101 March 1999 Long Term Program Semi-Annual Rept for Pilgrim Nuclear Power Station ML20207H5451999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Pilgrim Nuclear Power Station.With ML20196E2151998-12-31031 December 1998 1998 Annual Rept for Boston Edison & Securities & Exchange Commission Form 10-K Rept.With ML20206Q2741998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Pilgrim Nuclear Power Station.With ML20197J3591998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Pilgrim Nuclear Power Station.With ML20195C9951998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Pilgrim Nuclear Power Station.With ML20154K0721998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Pilgrim Nuclear Power Station.With ML20153D3901998-09-22022 September 1998 Safety Evaluation Granting 970707 Request to Use Guidance in GL 90-05 to Repair Flaws in ASME Class 3 Salt Svc Water Sys Piping for Pilgrim Nuclear Power Station ML20197C5011998-09-0404 September 1998 Rev 12C,Pages 4 & 5 to Pilgrim Nuclear Power Station Colr ML20197C5471998-08-31031 August 1998 Rev 12C to Pilgrim Nuclear Power Station Colr ML20151W8231998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Pilgrim Nuclear Power Station.With ML20237E2251998-08-26026 August 1998 Suppl & Revs to SE for Amend 173 for Pigrim Nuclear Power Station ML20237A9941998-07-31031 July 1998 Monthly Operating Rept for Pilgrim Nuclear Power Station ML20236U8201998-07-13013 July 1998 Rev 12B to Pilgrim Nuclear Power Station COLR (Cycle 12) ML20236P0151998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Pilgrim Nuclear Power Station ML20249A3741998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Pilgrim Nuclear Power Station.W/Undated Ltr ML20247H2081998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Pilgrim Nuclear Power Station ML20207B7601998-03-31031 March 1998 Final Rept, Pilgrim Nuclear Power Station Site-Specific Offsite Radiological Emergency Preparedenss Prompt Alert & Notification System Quality Assurance Verification, Prepared for FEMA ML20216G3911998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Pilgrim Nuclear Power Station ML20216J3741998-03-19019 March 1998 Safety Evaluation Accepting Licensee Request to Evaluate Elevated Tailpipe Temp on Safety Relief Valve SRV 203-3B ML20248L2241998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Pilgrim Nuclear Station ML20202G5251998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Pilgrim Nuclear Power Station ML20236M8511997-12-31031 December 1997 1997 Annual Rept for Boston Edison & Securities & Exchange Commission Form 10-K Rept ML20198L7701997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Pilgrim Nuclear Power Station ML20203D6101997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Pilgrim Nuclear Power Station ML20202D5761997-11-0808 November 1997 1997 Evaluated Exercise BECO-LTR-97-111, Monthly Operating Rept for Oct 1997 for Pilgrim Nuclear Power Station1997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Pilgrim Nuclear Power Station ML20217D6431997-10-0101 October 1997 Safety Evaluation Granting Request for Approval to Repair Flaws in Accordance W/Gl 90-05 for ASME Class 3 SSW Piping for Pilgrim ML20217H5621997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Pilgrim Nuclear Power Station ML20216J4131997-08-31031 August 1997 Monthly Operating Rept for Aug 1997 for Pilgrim Nuclear Power Station ML20210J3321997-07-31031 July 1997 Monthly Operating Rept for Jul 1997 for Pilgrim Nuclear Power Station 1999-09-08
[Table view] |
Text
< . . .
O OPERATING DATA REPORT DOCKET NO. 50-293 DATE 4/3/80 COMPLETED BY G.G. Whitney TELEPHONE 617-746-7900 OPERATING STATUS Pilgrim I Notes ,
- 1. Unit Name:
ch, N
- 2. Reporting Period: ,
1990
- 3. Licensed Thermal Power (MWt): --
- 4. Nameplate Rating (Gross MWe): 678 ,
- 5. Design Electrical Rating (Net MWe):
655 ;
U
- 6. Maximum Dependable Capacity (Gross MWe): - -
6N
- 7. Maximum Dependable Capacity (Net MWe): .~
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons: i None
- 9. Power Level To Which Restricted. If Any (Net MWe): None
- 10. Reasons For Restrictions. If Any:
N.A.
f This Month Yr..to-Date Cumulative
- 11. Hours In Reporting Period 744.0 2184.0 64080.0 l
- 12. Number Of Hours Reactor Was Critical 0.0 96.1 45077.0
- 13. Reactor Reserve Shutdown Hours- 0.0 0.0 0.0
- 14. Hours Generator On-Line 0.0 96.1 43648.6 !
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0 !
- 16. Gross Thermal Energy Generated (MWH) 0.0 181152.0 73272264.0 ,
.17. Gross Electrical Energy Generated ("MWH) 0.0 61340.0 24226174.0 j
.._.18. Net Electrical Energy Generated (MWH) 0.0 58860.0 23264983.0
_ .. , 19. Unit Service Factor 0.0 4 . 4- 68.1
- 20. Unit Availability Factor 0.0 4.4 68.1 _
i
. _ . ..__ 21. Unit Capacity Factor (Using MDC Net) 0.0 4.0 54 .2
_ 22. Unit Capacity Factor (Using DER Net) 0.0 4.1 55.4 .
- 23. Unit Forced Outage Rate 0.0
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each):
Refuel Outage cocunenced Jan. 5,1980.
.. 25. If Shut Down At End Of Report Period. Estimated Date of Startup: Estimated startup Mid May, 1980 j
- 26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved
_ INITIAL CRITICALITY :
INITIAL ELECTRICITY COMMERCIAL OPERATION l
l (9/77) 800423o M; N
AVERAGE DA!LY UNIT POWER LEVEL I
DOCKET NO. 50-293 Pilgrim I UNIT gg 4/3/80 COMPLETED BY G.G. Whitney ;
~
~'
TELEPHONE ,
March, 1980 MONTH DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL :
(MWe-Net) x (MWe-Net) !
._ I. 0 .
g7 0 i
, 0 ,,3 0
0 0 3 19 0 .. 0 4 20 0 0 2 21 0 0 6 22 .
0 7 *J 0 [
8 24
'-"~~'
0 0 9 25 l 0 0 j 10 26 0 0 !
II 2; i
O O :
12 23 I 0 0 13 29 ,
0 14 30 0 0 15 31 16 i
INSTRUCTIONS On this format. list the average dany unit power level in MWe Net for each day in the reporting month. Compute to ,
the nearest whole megawatt.
(Q/77) !
l l
l l
?
(
L__ . - - - .
- t 1 I 9
/
7 SF I N 7 : :
_ ) .o SFo c
_ hr
- ec de 1 ud /
_ l e 0
_ d 5
_ / D a
8 t 0 e 2
l l - GFEDCB.AR
- - - - - e S 8R ,-
- oOAORRMEa tp dp e e aqs hemegl u fiu o eunin er r tp :
r a ia 7
( it snt a nnm ile 4 $5E
- Eoti xnr r o ot rg ae 4
_- la a Ty nn pa lia t r ct e F 0
ygE' iEviR nrr ene oa
) is fil o gnt i r Tue r r
e '
(
E &ct s t( C 5ih
, x loi i n E
x pl c p a e l j2 ni n ai
.- )
s e n 2 g
U E
) 5sY .e N
x dge I T
-. a S
mi i n R l a E U t
P 1 i
o R L O D
. n N
. peEci v e R O A oen ns r T W
. t t e '4f N
- e S 0 A N
. T N 3 i l D P
M O 4321 M R mg E a W
- - - - e OAMMt C r t
uaah O?g c E R
ht eo nno uud ,h r R
( mlaa:
a l F E Et S U 1 D
xic c r E g 9 U plSa L 8 C
a icm X ., 0 T nr a. X I
) O
- m. N S
5 4 C P
r C O E 0EEfE o e a TM D x 1 vn r x N s e
u E P UO h 6et 1nr yPir b h nae s
L EL NC I
i E
b i
t
) t R Sp t ei .A t c Ri t & P HE TTK E I
ehaG e cnu oC DNT per ODAA N ot ea -
S t ut r r N8TM a
m (
r siI t
fns on r r
e n
o e c t
EYEE.O Lr o t i e or c v e e S
o ELfu c 6 4 P 5 u
r RiDti
) c ea o 1
7
.G /i 3 l 0
c Fnt n - .G /e 2 e ils a s W8 r 9 e ee 7
( 4 h0 i 3 N 6 i m
- t U 7 n I R
I 9 e 0y G. 0
\ .
PILCRIM NUCLEAR POWER STATION Month March, 1980 MJOR SAFETY RELATED MAINTENANCE (5~EM CC:2CNENT MALFUNCTION CAUSE MAINTENANCC CORRECTIVE ACTION n;SSOCIAs c.
.D L1 m nortrne pernonrece
~
Relief Valves New top works on N.A. N.A.
1 N.A. N.A.
all-reinstall (4) 3 CRD S ticking /drif ting Water? Replaced with new N.A. N.A.
74 drives.
3 MSIV'S Failed LLRT Wear Machine seats Replace Internals N.A.
4 Feedwater check Failed LLRT Wear Replacing soft N.A. -
N.A.
valves seats 5 MOV 1301-61 Leaked by seat Erosion Remove seat & disc N.A. N.A.
and replace with new 6 Salt Service Leaked by seat Erosion Install new discs N.A. N.A.
Water Valves G
G e
___m________A._____________________ _ _ 1
BOSTON EDISON COMPANY PILGRIM NUCLEAR POWER STATION Summary of Operations for March. 1980 The unit has been shut down all month for the 1980 Refueling Outage.
f All outage work continues and is on schedule.
% *O b
I P
l l
i
..~.'.,
REFUELING INFORMATION The following refueling informatf on is included in the Monthly Report as !
requested in a letter to Mr. G. C. Andognini dated January 18, 1978:
For your convenience, the information supplied has been enumerated so that ,
each number corresponds to equivalent notation utilized in the request. l
- 1. The name of this facility is Pilgrim Nuclear Power Station, Docket No. "
50-293. .
- 2. Scheduled date for next Refueling Shutdown: September, 1981 [
t
- 3. Scheduled date for restart following refueling: May, 1980
- 4. !
- 5. Due to their sinflarity, requests 4, 5, & 6 are responded to collectively. l i
~ ~ -
- 6. "The" fuel, which has been ~16ad5d during the'~~preseiit' iclii'duled refueling outage,~ [
is of the new P8x8R design, consisting of approximately 64 P8DRB282 [
assemblies and 120 P8DRB265 assemblies. The licensing submittal and pro- i posed Technical Specification changes were submitted on December 12, 1979. l I
- 7. (a) There are 580 fuel assemblies in the core. ;
(b) There are 764 fuel assemblies in the spent fuel pool.
- 8. (a) The station is presently licensed to store 2320 spent fuel assemblies.
The actual spent fuel storage capacity is 1770 fuel assemblies at present.
l (b) The. planned spent fuel storage capacity is 2320 fuel assemblies.
- 9. With present spent fuel in storage, the spent fuel pool'now has the capa- ;
city to accommodate an additional 1006 fuel assemblies.
i l
l