g.-

MISSISSIPPI POWER & LIGHT COMPANY Helping Build Mississippi EmahhikinenE P. O. B O X 16 4 0, J A C K S O N, Ml S SIS SIP PI 3 9 2 0 5 anoouction ore ar uv '

April 15, 1980 Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW Suite 3100 Atlanta, Georgia 30303 Attention: Mr. J. P. O'Reilly, Director

~

Dear Mr. O'Reilly:

SUBJECT:

Grand Gulf Nuclear Station Bechtel Job No. 9645 File 0290/0494/15321 RII: PKV 50-416, 417/79-34/30 Supplemental Response for IE Inspection Report AECM-80/77

Reference:

AECM-80/67, dated April 4,1980 As requested by your Mr. P. K. Van Doorn on April 14, 1980, the attached information is submitted to supplement and clarify Mississippi Power & Light's previous response transmitted by the referenced letter.

Yours tr ly, f d

}.s y

P. McGaughy, Jr.

Director of Power Production ATR:1b Attachment cc: Mr. N. L. Stampley Mr. R. B. McGehee Mr. T. B. Conner Mr. Victor Stello, Jr., Director.4 73;3 (g,mf pg'3 Division of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.

20555 j

s6 800423()377 1/I Member Middle South Utilities System

]U i

l t

t ATTACHMENT TO AECM-80/77 i

Page 1 of 1 f

I i

Supplemental Response to NRC Item 50-416/79-34-01

{

I (1) Corrective Steps Taken and Results Achieved This response is supplemented as follows:

A review of the Unit I radiographs for the piping spools supplied by the NSSS sub-tier vendor in question has been conducted. This review revealed density ranges were in I

excess of T-262.3 and a review of the area of interest on adjacent film was not possible as the flash card film identification on a few films had been positioned so as to obscure a small percentage i

of the overall weld.

(2) Corrective Steps Taken to Avoid Further Noncompliance (a) This response applies to the Recirculation System piping as well.

(b) This response applies to the Recirculation System piping as well.

(c) This response requires no change.

l (3) Date to Achieve Full Compliance This response applies to the Recirculation System piping as well.