Commonwealth Edison One First National Piara. Chicago, lilinois Address Reply to: Post Office Box 767 Chicago filinois 60690 April 14, 1980 Mr. Dennis L. Ziemann, Chief Operating Reactors - Branch 2 Division of Operating Reactors U.S. Nuclear Regulatory Commission Washington, D.C.
20555
Subject:
SEP Topic Re ferences Dresden Unit 1 NRC Docket No. 50-10 Reference (a): Dennis L.
Ziemann Letter to D.L. Peoples Dated February 14, 1980
Dear Mr. Ziemann:
In response to reference (a) Commonwealth Edison has compiled the following list of references:
VI-7.A.3 - ECCS Actuation System 1.
Technical Specifications for Dresden 1, Section 4.5(A),
" Core and Containment Cooling Systems," July 29, 1974.
2.
ECCS Design Report, Revision 1, March 1978.
VI-7.8. - ESF Switchover from Injection to Recirculation Mode 1.
Dresden Unit 1 ECCS Design Report, Section '.3.2.2.3, "Long-Term Cooling," March 1978.
VI-10. A - Testing of Reactor Trip System and Engineered Safety Features, Including Response Time Testing 1.
Final Hazards Summary Report and Amendments, Sections D and J.
2.
Dresden Unit 1 Technical Specifications, July 18, 1978.
VII-1.A - Isolation of the Reactor Protection System (RPS) from Nonsafety Systems, Including the Qualification of Isolation Devices l
1.
June 30, 1975 B.B. Stephenson letter to,J.G. Keppler 2.
September 29, 1975 R.L. Bolger letter to Edson G. Case 3.
December 10, 1975 C.A.
Abrell letter to D.L.
Ziemann 4.
January 12, 1976 R.L. Bolger letter to Dennis L.
Ziemann 8 0 0 4 23 0cr7;p
w Commonwealth Edison 5.
June 23, 1976 Dennis L. Ziemann letter to R.L. Bolger 6.
September 30, 1976 G.J. Plimi letter to Dennis L.
Ziemann 7.
November 15, 1976 G.A. Abrell letter to D.L. Ziemann 8.
July 8, 1977 R.L. Bolger letter to Secretary of the Commission 9.
November 2, 1977 Memo to Don K. Davis from Paul O'Connor 10.
November 11, 1977 M.S.Turbak letter to Donald K. Davis 11.
November 17, 1977 M.S. Turbak letter to Donald K.
Davis 12.
December 14, 1977 M.S.
Turbak letter to Paul O'Connor 13.
January 6, 1978 Don K. Davis letter to R.L. Bolger 14.
March 3, 1978 D.L. Ziemann letter to Cordell Reed 15.
March 23, 1978 M.S. Turbak letter to D.L. Ziemann 16.
June 2, 1978 M.S. Turbak letter D.L. Ziemann 17.
November 6, 1979 R.F. Janecek letter to Dennis L. Ziemann VII Engineered Safety Features (ESF) System Control Logic and Design 1.
"Dresden Unit 1, ECCS Design Report," Revision 1, March 1978, Figure 6.3-2,
" Control Logic Diagram for HPCI System" 2.
Drawing 12E1001-P1, " Schematic Diagram, Initiation Circuit 1, Emergency Core Cooling System," Revision F1, June 21, 1979 3.
Drawing 12E1001-P4, " Schematic Diagram, Initiation Circuit 2, Emergency Core Cooling," Revision E, October 28, 1974.
4.
Section III A.3.f, " Electrical Systems," Supplement A to Proposed Change No. 17 to Operating License DPR-2 as amended, Docket No. 50-10, September 17, 1970.
5.
Final Hazards Summary Report, Section 12.a.li, " Diesel Generating System Operation," Revised April 1, 1970 6.
Dresden Unit 1 Technical Specification, Section 6.6.A.1,
" Reporting Requirements; Routine Reports--Startup Report,"
March 1, 1978.
f i
I i
Commonwealth Edison I
b I
3-I i
(
One (1) original and thirty-nine (39) copies of this letter
(
)
have been provided for your review.
If you have any questions, please contact this office.
I
[
1 i
Yours Very Truly, i
Robert F. Janecek
[
l Nuclear Licensing Administrator j.
Boiling Water Heactors ti i
NPS/dg 2669A 2
j i
i I
s I
I ri 4
t e
i L
i l
t I
i I
I i
I L'
r J
t
,m-
.c n,-
.+
-,3
,-,,,-e,--.
- ------,,-.---,,,-w--,,n-e-e
,,.,,--n-m-
--