ML19305D908
| ML19305D908 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 01/14/1980 |
| From: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | |
| Shared Package | |
| ML19305D902 | List: |
| References | |
| 50-293-79-21, NUDOCS 8004160141 | |
| Download: ML19305D908 (1) | |
Text
-
O APPENDIX A NOTICE OF VIOLATION Boston Edison Company M/C Nuclear Docket No. 50-293 Based on the results of an NRC inspection conducted on December 10-14, 1979, it appears that one of your activities was not conducted in full compliance with the conditions of your NRC Facility License No. DPR-35, as indicated below.
This item is categorized as a deficiency.
Technical Specification 6.8.D states, " Written procedures to implement the Fire Protection Program shall be established, implemented, and maintained."
Plant Procedure 1.3.4, " Procedures," Paragraph III.A, states, in part, "...Proce-dures shall be implemented in accordance with safety standards, Technical Speci-fications, and requirements of regulatory agencies..."
Contrary to the above, the following plant procedures for operation of Fire Protection System:
No. 2.2.25, " Fire Water System" No. 2.2.26, " Deluge and Sprinkler Systems" No. 2.2.27, " Carbon Dioxide System" No. 2.2.28, " Dry Chemical Systems" No. 2.2.29, " Smoke Detection Systems" did not adequately implement or were not in accordance with various Technical Specification requirements as specified in Technical Specifications 3.12 and 4.12.
l
- -