ML19305D777

From kanterella
Jump to navigation Jump to search
Forwards LER 80-012/01T-0
Date released: 11/15/2019 Download: ML19305D777


LER 80-012/01T-0:on 800328,during Seismic Analysis Required by IE Bulletin 79-14,discovered That Pipe Supports RHR-H-83 & RSW-H-168 May Be Inadequate to Support Seismic Loads. Caused by Deviations from Hanger Design Details
ML19305D780
Person / Time
Site: Vermont Yankee Entergy icon.png
Issue date: 04/11/1980
From: Murphy M
VERMONT YANKEE NUCLEAR POWER CORP.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML19305D780 (1)
Forwards LER 80-012/01T-0
ML19305D776
Person / Time
Site: Vermont Yankee Entergy icon.png
Issue date: 04/11/1980
From: Murphy W
VERMONT YANKEE NUCLEAR POWER CORP.
To: GRIER B H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML19305D776 (1)