{{#Wiki_filter:~ l VERMONT YANKEE NUCLEAR POWER STATION MONTHLY STATISTICAL REPORT 80-03 FOR THE MONTH OF MARCH, 1980 8004150 %
i 'm. i OPERATING DATA REPORT DOCKET NO. 50-271 ' DATE 800411 CO51PLETED BY F. C. Beers TELEPHONE 617 '466 0011 X2215 l OPERATING STATUS - I. Urdt Name: Vermont Yankee Notes March 1980
- 2. Reporting Period:
- 3. Licensed Thermal Power (51Wt): -
1593
- 4. Namepiste Rating (Gross 31We):
j 540
- 5. Design Electrical Rating (Net 51We): 514 (open) 504 (closed )
s. 535'
- 6. 51sximum Dependable Capscity (Gross 5tWe):
50 4
- 7. 5!sximum Depends'ble Capacity (Net SIWE):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
l ~
- 9. Power Level To Which Restricted. If Any (Net 51We):
- 10. Ressons For Restrictions.If Any:
l t This Sionth Yr.to.Date Cumulative 744 2.184 _
- 11. Hours !n Reporting Period 721.5 2,056.3 53,214.69
- 12. Number Of Hours Reactor Was Critical 0
0 0
- 13. Reactor Resene Shutdown Hotra
- 14. Hours Gener: tor On.Line 721.5 2.032.1 51.359.88 l
- 15. Unit Reserve Shutdown Hours 0
0 0
- 16. Gross Therms! Energy Generated (51WH) 1,142,171.5 3.108.136.5
-72.332.749.5 -{
- 17. Gross Electrical Energy Genersted (51WH) 392,664 1.065,240 24.034,910 376,988 1,022,439 22,790,804
- 18. Net Electrical Energy Generated (51WH)
- 19. Unit Service Factor 97 93 77.8 97 93 77.8
- 20. Unit Availability Factor 100.5 92.9 68.5
- 21. Unit Capacity Factor (Using 5tDC Net) 98.6 91.1 67.2
- 22. Unit Capacity Factor (Using DER Net) 0 1.3 6.3
- 23. Unit Forced Outs;e Rate
- 24. Shutdowns Scheduled Over Next 6 Stanths (Type.Date.snd Duration of Each1:
April 2, 1980
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup: -
Forecast Achieved
- 26. Units !n Test Status (Prior to Commercial Operatiq INITIA L CRITICA LITY j
INITIA L ELECTRICITY COstStERCIAL OPERATION' k
- (4/77)
,.m,,
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-271 UNIT Vemont Yankee DATE 800411 C05fPLETED BY F. C. Beers 617-366-9011 X2215' TELEPHONE 5!ONTH March 1980 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (31We-Net) (51We Net) 1 526
- 17 525 2
517 13 525 3 525 39 526 4 525 20 525 5 525 21 525 6 525 525 22 525 519 7 23 525 525 1 8 24 520 525 9 25 526 525 10 26 II 525 27 525 525 524 12 28 525 524 13 29 34 525 505 30 15 525 33 0 16 513 INSTRUCTIONS On this formst. list the sverage dtily unit power level in 11We-Net for each day in the reporting inonth. Compute to the nearest whole megswatt. (9/77) 4 b s - - - - - ~,
i UNITSIIUTDOWNS AND POWER REDUCTIONS DOCK ET NO. 50-271 UNIT NAM E Vermont Yankee I) ATE 800411 COMPLETED liY F. C. Beers REPORT Af0NTig March 1980 TELEPilONE 617-366-9011 X2215. c c. ~3 -. E 5* 2 8 -o.s 'g Licensee c 't. c., Cause & Currective e $3 A,.iion io No. Date g 3g ,g g cc Event
- s ?
c$ E 5, j di y Repos * 'N0 yO Prevent itecussence d 80-9 800330 S 22.5 B-1 N/A HD VALEX Main Steam Valve which isolates the steam supply to the main turbine steam se'al regulator was leaking steam to the atmosphere. Valve was replaced with piping. I 2 3 4 F: Fosted Reason: Method: Exhibii G - Instructions i S: Scheduled A !?einipment Failure (Explain) I Manual for heparation of D.na i n-Maintenance or Test 7 Manual Sesam. Episy Sheets l'on 1.ieensee C Itefueling 3 Automatic Scram. Event Itepins (Llilt) 17de (NUltl'.G. D Regulaimy Resisiction 4 Other (Emplain) 0161) E-Opes.iior Tsaining& License Examination II Ailminitisalive 5 G O <sational I.esus (Emplain) Exhil.it I Same Sumee i t'8/17) II.Uthes (limplain) e m _.,m. ,w.,
DOCKET NO. 50-271 UNIT Vermont Yankee DATE 800411 C0!4PLETED BY F. C. Beers TELEP110NE 617-366-9011 X2215 SAFETY RELATED !!AINTENANCE MARCII 1980 NATullE OF LER CR OUTAGE ilALFUNCTION EQUIPMENT MAINTENANCE NUf1BER CAUSE !!ESULT C0ltlECTIVE ACTION RCIC Testable Check Corrective N/A Normal operation Leakage Replaced gaskets Valve V-13-22 MR 80-238 APRM "B" Corrective N/A Failed relay APRM tripped Replaced relay coil MR 80-275 coil llPCI Time Delay Relay Corrective N/A Worn parts Timer set point Replaced relay 23A-K48 MR 80-277 drift (Did not exceed Tech. Spec. limit) "A" Diesel Generator Corrective N/A Normal use Clogged filter Replaced filter Fuel Oil Filter MR 80-325 "A" Diesel Generator Corrective N/A Normal operation Worn bearings Replaced bearings Coolant Circulating Pump MR 80-326 IIPCI Flow Controller Corrective LER Failed controller Controller would Replaced controller 23-108 MR 80-351 80-13/3L not operate in automatic 4 RilR Seismic Support Corrective LER Improper Hanger inadequate Repaired as necessary RllR-li-83 MR 80-363 80-12/IP installation Service Water Support Corrective LER Improper Hanger inadequate Repaired as necessary RSW-l!-168 MR 80-364 80-12/IP installation
b DOCKET NO. 50-271 UNIT Vermont Yankee DATE 800411 COMPLETED BY F.
- c. Beers TELEPHONE 617-366-9011 X2215 REPORT MONTH March 1980 SU'BIARY OF OPERATING EXPERIENCES Highlights Vermont Yankee operated at 96.4% of rated thermal power for the month. Gross electrical generation was 392,664MWH or 97.7% of design electrical capacity.
Operating Summary The following is a chronological description of plant operations including other pertinent items of interest for the month: 3/1/80 At the beginning of the reporting perio,d, the plant was operating at 99.8% of rated thermal power. 3/30/80 At 2200 hours a shutdown was cornmenced to repair leaking steam valve V60-13, 3/31/80 At 0126 hours the turbine was taken off the grid. At the end of the reporting period, the plant was shutdown. ..}}