Monthly Operating Rept for Mar 1980
ML19305D318
Person / Time
Site: La Crosse File:Dairyland Power Cooperative icon.png
Issue date: 04/02/1980
From: Goodman L
DAIRYLAND POWER COOPERATIVE
To:
Shared Package
ML19305D317 List:
References
NUDOCS 8004140367
Download: ML19305D318 (7)


Text

'

3(v OPERA !!NG DATA REPORT DOCKE1 NO 50-409 pggt 04-02-80 CO\\lPL L Il D llY lisS.._ GOODMAN I LI LPilOst

__6 0 8-6E9-2 3 31 Ort R \\11NG si u rs N"'"

l. Unit Name:

M NT DOILING WATE_R REACIOR

2. Repunting reriod. _0000, 80-01-03 'IO_2400, 80-31-03
3. LicenscJ 1hermal Power iMht, 165 s

4 Nameplate Rating (Grow Mber 65.3

5. Design Electrical Rating (Net Mhet: - 50 l

Masimum Dependable Capacity sGrow Mwei. 50

{

6 40 Masimun Dependabic Capacity INet \\lher

%. Il Changs Occur in (.apacit> Ratine tirems Number 3 Through 71 Smee iet Report. Goe Reason-9 Power Les e! To hhkh Rntricted. If \\ns (Net 'thet 10 Rea ons F or Rntrictions. If \\m -

lhes \\lonth i r.to.l #.st e

( umulone

11. Ilours in Reporting Period 214 M A4

_91,.299

12. Number Of flours Reactor has Critical 144 2126.1

_39,931.6

13. Reactor Reene Shutdown floun 0

0 479

14. Ilours Generator On-Line 744

_2109.5

._55,114.3

15. U.it Resene Shutdown floun 0

-. 0 79

16. Grun Thermal Energy Generated l%IWili 102,303 290,880

_7,_5_75 d61 17 Grow f lectrical Energy Generated (Mhill 29,903 85,843 2,284,975

14. Net Electrical Energy Generated (Mhlil 2_8,197 80,844

_.2,113.579

19. Unit Senite Iactor 100.0 96.6

_60.4 20 Unit Asait bility Facio, 100.0 96.6 60.5

21. Unit Caruot> t actor IUsing utK Neo 79.0 77.1 48._2 22 t'mt ( apasiv> l' actor U ing DI.R Net, 75.8 74.0 46.3 0

3.4 6.3

23. Unit Forced Outage Rate
24. Shutdowns Scheduled Oser Nest 6 Months e ispe,llate. and Duration of I.nhl EOUIPMENT INSTALLATION REOUIRED BY NUREG_Q578.,JPRIL 6,
1980, 3 WEEKS. ESTIMATED REFUELING AUGUST 18, 12 % 6 WEEKS.
25. If Shut Down \\t I nd Of Report Period.13timated Date of Startup
26. Units in Test Status iPrior to Commercial Operation I urecast t6 inned INill \\ L ( RillC At lIY INill A L I Lt C I RICIIY

( O\\tMI R( l \\1 OPI R \\ TlON 8004140%f

AVERAGE DAILY UNIT POhER LEVEL 4

50-409 DOCKET NO.

LACBWR WIT 04-02-80 DATE COMPLETED BY A S. GOODMAN 608-689-2331 TELEPHONE MARCH 1980

\\f0NT11 D\\Y AVER AGE DAILY P0hTR LEVEL DAY AVER 4GE D \\lLY PO%ER LEVEL (MWe Net)

MWe.Neti I

39 39 i7 2

39 is 38 3

39 38 i,

4 39 20 28 5

39 25 6

39 36 22 7

39 39 23 s

39 24 39 9

39 25 39 10

.39 39

,6 39 39 11 37 12 39 39

,3 13 39 39 2,

34 39 39 30 15 39 39 33 I6 39 INSTRUCTIONS On this format lat the average daily unit power levelin MWe Net for each day in the reporimF month. Compute to the nearest whole rnegawatt.

(9/77)

a 50-409 DOCKET NO.

t'NII sillrlig)wNs OD POki R HilittllONs UNIT N AME LACBWR DATE 04-02-80 MARCH 1980 COMPLETED gy L.S. GOODMAN RI.POR I slONlil TELEPHONE 608-689-2331

[?

3 j E 'd IAenwt

[g

[!%

Cauw A Currestne 7

[-

Atenm to Date i

3?

?

2iE ihent E '?

j]-

Present Recurrense fE d

3fj Report =

s d.

80-02 03-20-80 F

0 B

4 NA HC XXXXX A POWER REDUCTION FROM 85% TO 47% WAS CONDUCTED FOR THE PURPOSE OF REMOVING EACH OF THE TWO TURBINE CONDENSER WATER BOXES TO CLEAN CONDENSER TUBES AND TO REMOVE ACCUMULATE 0 SILT FROM THE WATER BOXES.

THE CONDENSER CLEANING WAS ACCOMPLISHED TO IMPROVE TURBINE EXHAUST VACUUM AND TEMPERATURE CONDITIONS.

I 2

1 4

l' I orced Reaum

\\teihod I stubit G - Inst ru.ti,ms s Ssheduled A Lquipment l'ailure f I splaini

! Enual for Preparation ot' Data 34tainterurke or lest 24tanual A s.un.

Inte> Sheets tbr twensee C. Refueling L Autoni atk N tani.

ITent Report it 1 Ril'ite tNL'RI G.

D Regulater) Restr Ati..n 4-Othei ll s lain t 01611 I Operatoe Tsainmg A I Acuw I ununation 4

l'. Ad minist rat n e G Operational 1 iros ai splam p i slubit I - Same Souice (9/77)

II Ot her il si,lun t i

I

~

NAPRATIVE

SUMMARY

OF OPERATING EXPERIENCE MARCH 1980 l

At the onset of the March reporting period, power generation was continuing at 85% Reactor Rated Thermal Power (39 MWe-Net).

This operating power level has been scheduled to extend core life to stretch optimum production until refueling becomes necessary.

On March 20, 1980, power was reduced to 47% Reactor Rated Thermal Power for the purpose of removing each of the two turbine con-denser water boxes to clean condenser tubes and to remove accumulated silt from the water boxes.

The condenser cleaning was accomplished to improve turbine exhaust vacuum and temper-ature conditions.

Power re-escalation commenced on March-21, and 85% Reactor Rr. Led Thermal Power (39 MWe-Net) was reached on March 22.

Power generation continued at the 85% level through-out the remainder of the reporting period.

Significant maintenance items performed during the March 1980 reporting period are indicated on the attached Instrument and Electrical Maintenance and Mechanical Maintenance listings.

L 1

1 of 2 INSTRUMENT AND ELECTRICAL MAINTENANCE MARCH 1980 LER OR NATURE OF OUTAGE MALFUNCTION EQUIPMENT MAINTENANCE NUMBER CAUSE RESULT CORRECTIVE ACTION NUCLEAR INSTRUMENTA-PREVENTIVE NA TEST DUE COMPLETED TESTS COMPLETED TECHNICAL TION SPECIFICATION TESTS N-5 THROUGH N-9 SAFETY SYSTEM PREVENTIVE NA TEST DUE COMPLETED TESTS COMPLETED SAFETY SYSTEM CHANNEL 1, 2 AND WATER LEVEL #3 PURIFICATION RECORDER CORRECTIVE NA NORMAL USAGE INCORRECT CLEANED SLIDEWIRE MR 3104 READING NUCLEAR RECORDER CORRECTIVE NA NORMAL USAGE INCORRECT ADJUSTED SENSITIVITY CHANNEL N-5 MR 3013 READING WATER LEVEL GAUGE PREVENTIVE NA CALIBRATION 7ESTED GAUGE COMPLETED GAUGE WELL #3 REQUEST CALIBRATION FIRE DETECTION SYSTEM PREVENTIVE NA TEST DUE COMPLETED TEST BI-MONTHLY FIRE FLOW TEST COMPLETED POWER DISTRIBUTION FACILITY NA NEW EQUIPMENT COMPLETED IN-COMPLETED FACILITY SYSTEM CHANGE REQUEST STALLATION CHANGE 74-80-2 SECURITY SYSTEM CORRECTIVE NA NORMAL USAGE INOPERATIVE REPLACED FRONT DOOR MR 3017 SWITCH CONTROL SWITCH SECURITY SYSTEM CORRECTIVE NA INOPERATIVE NO ALARM REPLACED ALARM CARD MR 3020 FOR ZONE 3 SECURITY SYSTEM PREVENTIVE NA CHANGE DUE COMPLETED RENUMBERED SECURITY CHANGE DOOR COMBINATION CIRCULATING WATER PREVENTIVE NA REQUESTED COMPLETED CALIBRATED TRANSMITTER PUMP 1B CALIBRATION CALIBRATION D.C.

POWER DISTRIBU-PREVENTIVE NA TEST DUE COMPLETED TESTS COMPLETED QUARTERLY TION BATTERY TESTS COMMUNIC 2\\TIONS SYSTEM CORRECTIVE NA CONTAMINATED POOR TRANS-CLEANED CONTROL MR 3028 SWITCH MISSION SWITCH

2 of 2 INSTRUMENT AND ELECTRICAL MAINTENANCE MARCH 1980 LER OR NATURE OF OUTAGE MALFUNCTION EQUIPMENT MAINTENANCE NUMBER CAUSE RESULT CORRECTIVE ACTION RADIATION MONITORS PREVENTIVE NA TESTS DUE COMPLETED TESTS COMPLETED CALIBRATION OF PORTABLE RADIATION MONITORS NUCLEAR INSTRUMENTA-CORRECTIVE NA DEFECTIVE READING TOO REPLACED CHASSIS WITH TION CHANNEL N-1 MR 3030 TUBES HIGH SPARE I

l l

MECHAWICAL MAINTENANCE LER OR flATURE OF OUTAGE MALFUtiCTION EQUIPMEtlT t'Alf4TENAtsCE

f. UMBER CAUSE RESULT CORRECTIVE ACT10ft PURIFICATION SAMPLE CORRECTIVE NA SEATS FAILED LEAKAGE INSTALL NEW VALVES VALVES MR 3002 1A WASTE WATER PUMP CORRECTIVE NA DIAPHRAGM LEAKAGE INSTALL NEW DIAPHRAGM SUCTION VALVE MR 3009 FAILED CONTAINMENT BUILDING PREVENTIVE NA DIRT AND DUST BLOCKAGE OF CLEANED AND OILED, lA AND 1B AIR CON-MR 3022 FILTERS REPLACED FILTER DITIONERS CONTAINMENT BUILDING PREVENTIVE NA DIRT AND DUST BLOCKAGE OF REPLACED WITH NEW EXHAUST FILTERS MR 3022 FILTERS FILTERS

-.,