Forwards NRC 800310 Interim Decision Under 10CFR2.206, Deferring Decision on PSC of Mo Request for Suspension of Cp.Nrc Will Resume Consideration of Request After PSC Hearing Determination
ML19305C520
Person / Time
Site: Callaway Ameren icon.png
Issue date: 03/10/1980
From: Harold Denton
Office of Nuclear Reactor Regulation
To: Hearne T
MISSOURI, STATE OF
References
NUDOCS 8003310011
Download: ML19305C520 (3)


Text

.

DMuller KCornell DISTRIBUTI0fl WDircks M."1R 10 Ud0 Docket File RDeYoung NRC PDR WRegan Docket Ho STil 50-436 RBallard Re ding F

ch NRR Reading hp_ roe TERA R HDenton Treva J. !!aarne, Esquire hfs Assistant Genaral Counsel Blue Bag to 0 ELD liissouri Public Service Comission Secy CMiles P. O. Box 350 OGC HBerkow, PSB JMurray, OELD Jefferson City, Missouri 65101 MGroff GErtter (EDO#o7182)

Dear !1s. Hearne:

ISE (3)

Cy petition datad August 14, 1979, you requested on t,chalf of the Public Service Comission of the State of !!issouri, pursuant to 10 CFR 2.205 of the Comission's regulations, that the Director of f:uclear Reactor Regulation issue a show cause order to suspend the construction perait granted to Union Electric Company for Callaway Plant, Unit 2.

For the reasons stated in the enclosed decision, and in view of the fact that no construction is scheduled on Unit 2 until sometine in 1931, a final determination of your request has been deferred pending the final outcone of the hearings scheduled by the Missouri Public Service Comission for the spring of 1930. Therefore, no further action will be taken on the PSC's petition until submittal by you of the final deternination of the PSC in its hearings on the Union Electric Company expansion program.

I undarstand that decision is expected in the fall of 1930.

A copy of this interin decision will be placed in the Comission's Public Docunent Roca at 1717 H Street, NM., Washington, DC 20555 and in the local public document roons for the Callaway Plant at Fulton City Library, 709 Market Street, Fulton, Missouri 65251 and Olin Library of Washington University, Shinker and Lindell Coulevard, St. Louis, !!issouri 63130.

Sincerely, cc.': t.'

q by U.il.E:ut:n liarold R. Denton, Director Office of !!uclear Reactor Regulation

Enclosure:

Director's Interim Decision Under 10 CFR 2.206 bec:

A. Rosenthal, ASLAB cc:

See next page R. Lazo, ASLBP J. Buchanan, NSIC ACRS (16)

D

  • D]T V

9 g

M M S

!\\

nm nw

[

N 0 ELD [6

, )

SE:ADEP

,,,DSE omet ).

.E ase.

.HDen on...

SURNAMEkl.

N.

(WRenan.

U@.

3/ t1780 3/ /80

.p)8 occ >p / M/80

..,./.g/80 1.c 3

3 3

7..

...._.........__......._._.......-..op.

q

......._..i.....

l Union Electric Company (Callaway Plant, Unit 2)

Occket No. STN 50-486 cc: Thomas A. Baxter, Esq.

Attorney General Gerald Charnoff, Esq.

Supreme Court Building Shaw, Pittman, Potts & Trowbridge Jefferson City, Missouri 65101 1800 M Street, NW.

Washington, DC 20036 Mr. J. E. Birk Assistant to the General Counsel Mr. John K. Bryan Union Electric Company Vice President, Nuclear P. O. Box 149 Union Electric Company St. Louis, Missouri 63166 P. O. Box 149 St. Louis, Missouri 63166 Dr. Vern Starks Route 1. Box B63 fir. Nicnolas A. Petrick Ketchiki.n, Alaska 99901 Executive Director SNUPPS Resident Inspector 5 Choke Cherry Road U. S. Nuclear Regulatory Commission Gaithersburg, Maryland 20760 P. O. Box 1748 Jefferson City, Missouri 65101 Mr. Terry Rehma

' A-95 Coordinator Alice F. Bronsdon Office of Administration 7453 Washincton Division of State Planning & Analysi.s St. Louis, Missouri 63130 P. O. Box 809, State Caoptol Jefferson, City, Missouri 65101 Florence F. Johnson 916 Leonard Drive Honorable Paul H. Murphy St. Louis, Missouri 63119 Presiding Judge Callaway County Court Sharon Miller Gresekinn Fulton, Missouri 65251 13265 Olive Street Rd.

Chesterfield, Missouri 63017 EIS Coordinator, Region VII U.S. Environmental Protection Agency Babette F. Silverblatt 1735 Baltimore Avenue 7541 Yrok Dirve Kansas City, Missouri 64108 St. Louis, Missouri 63105 Mr. Norton Savage Ronald Douglas Banfield Economic Regulatory Administration 4460 Greenwich Ct., Apt B1 Power Supply & Reliability Division St. Louis, Missouri 63105 U.S. Department of Energy (RG-752) 2000 M Street, NW.

Edwin and Maury Fields Washington, DC 20036 3080 Cleveland St. Louis, Missouri 63110 Mr. Ricky G. Hummel 2650 California Ave.

Mr. R. J. Helmering

~St. Louis, Missouri 63118 1141 Hampton Park Drive St. Louis, Missouri 63117 Eldora Spiegelberg 7200 Pershing St. Louis, Missouri 63130 l

l

3-Miss. Susan Rogers 3220 Wyoming Street, Apt. 2W St. Louis, Missouri 63112-Robert A. Geller lil' South Bemiston Clayton, Missouri 63105 William M. Vaughn 839 Barrack Drive University City, Missouri 63132 James M. Kendell 3640 Shaw Blvd.

St. Louis, Missouri 63110

^

Shauna Feely 3419 Shenadoah St. Louis, Missouri 63104 John A. Wartenbe 8724 White Avenue Brentwood, Missouri 63144 Richard and Fran Glass 8737 Villa Crest Drive St. Louis, Missouri 63126 O

e

- k 1

.. t i

00 10 UNITED STATES OF AMERICA NUCLEAR REGULATORY C0!?iISSION OFFICE OF NUCLEAR REACTOR REGULATION HAROLD R. DENTON, DIRECTOR In the Matter of

}

)

Docket No. STN 50-486 UNION ELECTRIC CCMPANY

)

(Callaway Plant, Unit 2)

)

(10CFR2.206)

INTERIM DECISION UNDER 10 CFR 2.206 By petition dated August 14, 1979, the Public Service Comission of the State of Missouri (hereinafter referred to as PSC) pursuant to 10 CFR 2.206 of the Comission's regulations requested the Director of the Office of Nuclear Reactor Regulation, the Director of the Office of Nuclear Material Safety and Safeguards, and the Director of the Office of Inspection and Enforcement to issue a show cause order to suspend the construction pennit granted to Union Electric Ccmpany for Callaway Plant, Unit 2.

This matter was referred to the Director of the Office of Nuclear Reactor Regulation because the subject matter of the requested action was within the jurisdiction of this office. Notice of receipt of the PSC petition was published in the Fe'deral Register, 44 Fed. Reg. 53116 (Sept.12,1979).

The basis for the PSC's requested action is recent infonnation developed by the PSC (in Preliminary Union Electric Company Peak Cemand Projection) which' indicates that the peak demand forecast of Union Electric Company may be erroneous.

l The PSC states that the National Environmental Policy Act, (NEPA) 42 U.S.C. 4321 g seq., and the NRC's regulations implementing NEPA,10 CFR Part 51, require the Comission to consider the enviro generated by Callaway Plant, Unit 2.

DUPLICATE DOCUMENT recently discovered facts on peak.deman Entire document previously

,....:, 2 u.

....--..-a--

A N o.

of Pages:

-w p,_-p g-.

,,yy--yw y--,-,,w.----ge.,

ww--wv v-pwp-

,yg w-e-

~

UNION Et.ECTmc COMPANY 1 09 ORATIOT STR*WT sr. i.ovie. Mi oure January 4, 1980

    • C. T.

.v.m Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555 ULNRC-332

Dear Mr. Denton:

DOCKET NO. STN 50-486 CALLAWAY PLANT, UNIT 2 REQUEST FOR ACTION UNDER 10 CFR 2.206 By letter dated September 28, 1979, Messrs. Gerald Charnoff and Thomas A. Baxter, Counsel for Union Electric Company, submitted comments on our behalf relative to the Missouri Public Service Commission's request for institution of proceedings to suspend the Construction Permit for Callaway Unit 2 as provided for in 10 CFR 2.206.

In addition to the information provided by Counsel in that letter, we are pleased to submit this report en the current status and projection of construction efforts on Callaway Unit 2.

At.this time, no major field construction activity is in progress.

, Excavation for Unit 2 was completed concurrent with work on Unit 1.

Limited portions of underground piping and electrical duct banks associated with Unit 2 continue to be installed, along with subfoundations of the emergency service water pump house and cooling tower.

This work has been undertaken because its close proximity to Unit 1 structures renders it infeasible for construction to be deferred.

Apart from this work and based on our current schedule for Unit 2, with commercial operation in April, 1987, we do not intend to commence major construction of plant structures until early 1981.

Very/truly yours,

-[

Nt v..J ;:.XL 3. :' '.,.

1

\\

e l

'l John K.

l Bryan i

DFS/sla cc:

See Page 2 x6o3 Sb

,b%oc'b

,jo

~

a g

e 0 01090

~ gg,o

-.. ~, -

~

Mr. Harold R. Denton, Director January 4, 1980 Page Two cc:

Mr. Nicholas A. Petrick Executive Director SNUPPS P. O. Box 607 15740 Shady Grove Road Gaithersburg, MD 20760 Mr. Terry Rehma A-95 Coordinator Office of Administration Division of State Planning & Analysis P. O. Box 809, State Capitol Jefferson City, MO 65101 Treva J. Hearne, Esq.

Assistant General Counsel Missouri Public Service Commission P. O. Box 360 Jefferson City, Missouri 65101 Honorable Paul H. Murphy Presiding Judge Callaway County Court Fulton, Missouri 65251 EIS Coordinator, Region VII U. S. Environmental Protection Agency 1735 Baltimore Avenue Kansas City, Missouri 64108 Mr. Norton Savage Economic Regulatory Administration Power Supply & Reliability Division U. S. Department of Energy (RG-752) 1726 M Street, N.W.,

Room 850 Washington, D. C.

20036

,m.

.a

.