ML19305C465
| ML19305C465 | |
| Person / Time | |
|---|---|
| Site: | 07002322 |
| Issue date: | 02/28/1980 |
| From: | Howell J, Tillman A, Tobin W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | |
| Shared Package | |
| ML19305C464 | List: |
| References | |
| 70-2322-80-01, 70-2322-80-1, NUDOCS 8003280633 | |
| Download: ML19305C465 (1) | |
Text
-
turcr.tr - w, r-
.Ta Lj'
- pn an CD::i.::: 2.?::....._,,,a jo UNITED STATES y
NUCLEAR REGULATORY COMMISSION
/9 E REGION ll
'8 o,
101 MARIETTA ST., N.W.. SUITE 2 300 o
ATLANTA, G EORGIA 30303 FEB W 91980 Report No. 70-2322/80-1 Docket No. 70-2322 License No. IShm 1651 Licensee:
Edlow International Company 1100 - 17th Street, N. W.
Washington, D. C.
20036 Inspection at:
Savannah River Plant, Barnwell, South Carolina Inspection conducted:
Febreary 9-10 and 19-20, 1980 Type of Inspection: Announced Physical Security Inspector de A M;t;/O
(/A. Tillman, Physical Security Inspector Date
]b 4 A -C,
'Jf)at'ethe 3fJ7C Howell, Physical Security Inspector D
4
/
a-Approve [i.by h
6#
J o e 50 cW.'J. Tobin, Acting Section Chief at b Safeguards Branch Inspection Summary Areas Inspected:
Included review of procedural requirements relating to the security of irradiated fuel shipments in-transit.
The inspection involved 18 inspector hours on site by 2 NRC inspectors. The inspection was begun during an offshift pe(iod; 14 inspection hours were accomplished during offshift periods.
Results: The licensee was found to be in compliance with NRC requirements within the area examined.
$0 SY S-T2 Copy of
.C: pica 4
p----
m 3 p---
r e -- t c %
re?" ' ar' t::scific npprc tal e ' :: El ygrRL'!Ti",." ",iT1IET7.'iTS
........m...
C,,.....7
- s00 3 2 8 % (o37