Informs That Mods to ECCS Will Be Complete by 800327.All Necessary Procedures Have Been Changed & Operator Training Completed on 800319.Testing & Installation Will Be Completed Prior to Achieving Criticality at End of Refueling Outage
ML19305C432
Person / Time
Site: Rancho Seco
Issue date: 03/21/1980
From: Mattimoe J
SACRAMENTO MUNICIPAL UTILITY DISTRICT
To: Reid R
Office of Nuclear Reactor Regulation
References
NUDOCS 8003280541
Download: ML19305C432 (1)


Text

.

$SMUD SACRAMENTO MUNICIPAL UTILITY DISTRICT C 6201 s street. Box 15830. sacramento, California 95813; (916) 452-3211 March 21,1980 Director of Nuclear Reactor Regulation Attention: Mr. Robert W. Reid, Chief Operating Reactors, Branch 4 U. S. Nuclear Regulatory Commission Washington, D. C.

20555 Re: Docket 50-312 Rancho Seco Nuclear Generating Station, Unit No. 1

Dear Mr. Reid:

On November 22, 1978, the Sacramento Municipal Utility District requested an exemption from 10CFR50.46 until further im-provements to the ECCS could be made. These improvements consisted of modifications which would eliminate any requirement for operator action following a small break. These modifications are being in-stalled this refueling outage. Based on the present schedule, it is anticipated that modification will be complete by March 27, 1980. All of the necessary procedures have been changed and operator training was completed on March 19, 1980. By this letter, the District is committing itself to completion of the installation and testing prior to achieving criticality at the end of this refueling outage.

If you have any questions on this item, please contact us.

Sincerely, G L b &Y John J. Mattimoe Assistant General Manager and Chief Engineer AOO/