ML19305B958

From kanterella
Jump to navigation Jump to search
Forwards LER 80-008/03L-1
Date released: 11/15/2019 Download: ML19305B958


Revised LER 80-008/03L-1:on 800129,while Increasing Reactor Power by Rod Withdrawal,Operator Noticed Rod Select Matrix Backlighted & Rod Sequence Control Sys Not Initiating Rod Blocks Properly.Caused by Design Change
ML19305B960
Person / Time
Site: Hatch 
Issue date: 03/19/1980
From: Coggin C
GEORGIA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19305B960 (1)
Forwards LER 80-008/03L-1
ML19305B957
Person / Time
Site: Hatch 
Issue date: 03/19/1980
From: Manry M
GEORGIA POWER CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19305B957 (1)