ML19305B767
| ML19305B767 | |
| Person / Time | |
|---|---|
| Site: | Marble Hill |
| Issue date: | 02/25/1980 |
| From: | Shields S PSI ENERGY, INC. A/K/A PUBLIC SERVICE CO. OF INDIANA |
| To: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| References | |
| IEB-79-25, NUDOCS 8003200287 | |
| Download: ML19305B767 (1) | |
Text
m Mb 0 227804001
->N.., 77
..; Y PUBLIC SERVICE February 25, 1980 INDIANA S. W. Shields Vice President Electric System 1
Mr. James G. Keppler, Director Docket Nos.:
STN50-546 U.S. Nuclear Regulatory Commission STN50-547 Region III 799 Roosevelt Road Construction Permit Nos. :
Glen Ellyn, Illinois 60137 CPPR-170 CPPR-171 MARBLE HILL NUCLEAR GENERATING STATION, UNITS 1&2 lE BULLETIN No. 79-25
Dear Mr. Keppler:
1.
In response to IE Bulletin No. 79-25, Public Service Company of Indiana, Inc. (PSI) has determined that the Westinghouse BFD/NBFD relays discussed in the subject Bulletin are neither used or planned for use in safety-related systems at Marble Hill.
Sincerely,
/
j S.W. Shields TDG:jj cc:
U.S. Nuclear Regulatory Commission Office of Inspection and Enforcement Division of Reactor Operations Inspection Washington, D.C. 20555 E.R. Schweibinz,P.E.
J.J liarrison F=8 *o,1980 v
1000 East Main Street, Plainfield, Indiana 46168 317. 839.9611
-