Responds to NRC Re Violations Noted in IE Insp Rept 50-267/79-22.Corrective Actions:Maint Personnel Sent Ltr Emphasizing Cleanliness Requirements.Electrical Crew Received Memo Re Recording & Performing Requirements
ML19305B619
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 02/01/1980
From: Lee O
PUBLIC SERVICE CO. OF COLORADO
To: Madsen G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML19305B618 List:
References
P-80013, NUDOCS 8003190990
Download: ML19305B619 (2)


Text

.

y?

PUBLIC SERVICE COMPANY OF COLORADO P.

O.

Box 840 OENVER, COLORADO 80208 OSCAR R. LEE v1CE PREStCENT February 1, 1980 Fort St. Vrain Unit No. 1 P-80013 U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76012 Docket No. 50-267 Atta:

Mr. G. L. Madsen

Subject:

Inspection 79-22 l

Dear Mr. Madsen:

The following outlines the action taken in response to the Notice of Violation received as a result of inspections by your personnel in the period December 1 through 28, 1979. The numbering corresponds to that used in the Notice of Violation.

1.

Technical Services Procedure 13 was reviewed with operating personnel and the calculations, and' method of applying those calculations, thoroughly explained.

Further instructions regarding plant operations which are not covered by existing approved procedures will be issued via an Operations Order.

We are in compliance at this time.

2.

(a)

All maintenance personnel have been sent a letter emphasizing cleanliness requirements.

They are required to sign receipt and understanding of this letter.

In addition, the Auxiliary Electric room has been placed on a cleanup schedule and additional refuse containers and approved safety cans for combustible fluids have been made available.

-~We are now in compliance.

(b)

All members of the Electrical crew have received an instructional memo which they are required to acknowledge as understanding.

Also instructions as to recording and performing requirements have been included in PME-3.

Boosio

@o n

4

.' Mr. - G..Madsen :

Page Two February 1, 1980 1,.

We are now in compliance.

'Sh

~

ould.you have any questions regarding these actions please

. c'all.

Sincerely, Oscar R. Lee l

Vice President

'ORL:dkm l